STS-108
Endeavour
External Tank Separation
(File
Footage)
Download
Real Media Player
| 56k
Modem Connection |

On-orbit footage: The External Tank
is jettisoned and the payload bay
doors are opened. (No audio)
|
Cable/Broadband
Connection |
| 252k
file size |
1.1
MB file size |
|
|
|
|
|
|
| KENNEDY SPACE CENTER, Fla. (File
Footage) -– About 8 minutes, 30 seconds into the liftoff, the Shuttle's
main engines shut down and the external tank is jettisoned. Shortly
after the Shuttle reaches orbit, the crew opens the payload bay
doors and mission activities begin. |
| |
| STS-108
photos are online. (Note: This is a graphic-intensive
site and may be difficult to view with low speed modems or when
this web site receives heavy traffic loads). |
Live
Countdown Coverage | Previous Countdown
Events
Pre-Launch Video Table of Contents
| Launch Video Table of Contents
|