John F. Kennedy Space Center - Live Launch Coverage NASA Home Page

KSC Home

Site Search  Multimedia FAQ/Contact Us NASA Centers



STS-108 Endeavour
Pre-Launch Processing Flow
November, 2001

Download Real Media Player


56k Modem Connection
Shuttle Endeavour is processed for flight.
Shuttle Endeavour returns to KSC on a 747 jet, is processed for flight and mated to the External Tank and Solid Rocket Boosters. (No audio)
Cable/Broadband Connection
328k file size 1.4 MB file size

56k Modem Connection
The Leonardo MPLM is loaded into the payload canister.
The Leonardo MPLM is loaded into the payload canister for the trip to the launch pad. (Includes original audio)
Cable/Broadband Connection
203k file size 847k file size

56k Modem Connection
Astronauts Tani and Godwin participate in CEIT.
Astronauts Tani and Godwin participate in a Crew Equipment Interface Test (CEIT). (No audio)
Cable/Broadband Connection
216k file size 915k file size

56k Modem Connection
Shuttle Endeavour departs the VAB for Launch Pad 39B.
Shuttle Endeavour departs the VAB for Launch Pad 39B.
(Includes original audio)
Cable/Broadband Connection
244k file size 1.0 MB file size

KENNEDY SPACE CENTER, Fla. -– In the months leading up to the launch of STS-108, the Orbiter, payload and flight crew take part in several different processing operations. Top priorities for the STS-108 (UF-1) mission of Endeavour are rotation of the International Space Station Expedition Three and Expedition Four crews, bringing water, equipment and supplies to the station in the Multi-Purpose Logistics module Raffaello, and completion of robotics tasks and a spacewalk to install thermal blankets over two pieces of equipment at the bases of the Space Station's solar wings.
 
STS-108 photos are online. (Note: This is a graphic-intensive site and may be difficult to view with low speed modems or when this web site receives heavy traffic loads).

Live Countdown Coverage | Previous Countdown Events
Pre-Launch Video Table of Contents

Page Last Revised Page & Curator Information

November 30, 2001


Online Coverage : Dennis Armstrong (NASA) & Anna Heiney (IDI)
 Web Development: Lynda Warnock & Debbie Barton (FDC)
Video Production: Wayne Yon, Chris Chamberland, (Photobition)
Countdown Clock by: Jim Fitzgerald (FDC)

NASA Official: Dennis Armstrong (Dennis.Armstrong-1@ksc.nasa.gov)
Web Development: JBOSC Web Development Team
A Service of the NASA/Kennedy Space Center
Roy D. Bridges, Director