STS-108
Endeavour
Terminal Countdown
Demonstration Test
November 29, 2001
Download
Real Media Player
| 56k
Modem Connection |

The astronauts participate in emergency exit training
from the orbiter and launch pad.
(Includes original audio)
|
Cable/Broadband
Connection |
| 950k
file size |
3.9
MB file size |
|
|
|
|
|
|
| KENNEDY SPACE CENTER, Fla. -– STS-108
and Expedition Four crew members take part in a simulated launch
countdown, part of Terminal Countdown Demonstration Test (TCDT)
activities. STS-108 is a Utilization Flight that will carry the
replacement Expedition Four crew to the International Space Station,
as well as the Multi-Purpose Logistics Module Raffaello, filled
with supplies and equipment. |
| |
| STS-108
photos are online. (Note: This is a graphic-intensive
site and may be difficult to view with low speed modems or when
this web site receives heavy traffic loads). |
Live
Countdown Coverage | Previous Countdown
Events
Pre-Launch Video Table of Contents
|