|
Orbiter:
Columbia
Shuttle
Mission: STS-109
Date: March
1,
2002
KENNEDY
SPACE CENTER, Fla. -– Members
of the STS-109 crew participate in a pre-pack and fit check.
During the pre-pack and fit check, astronauts each don their
flight suits, helmets, and gloves as they would on launch day
to ensure a proper fit. The goal of the mission is to replace
Solar Array 2 with Solar Array 3, replace the Power Control
Unit, remove the Faint Object Camera and install the Advanced
Camera for Surveys (ACS), install the Near Infrared Camera and
Multi-Object Spectrometer (NICMOS) Cooling System, and install
New Outer Blanket Layer insulation.
Live
Countdown Coverage
| Previous Countdown Events
Pre-Launch Video Table of Contents
|
STS-109
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads). |