Live Countdown Coverage Banner
Image of navigation bar.
   

Orbiter: Columbia
Mission: STS-109
Date: March 12, 2002

KENNEDY SPACE CENTER, Fla. -- Bathed in the surreal glow of powerful xenon lights, Columbia touches down on KSC's Runway 33 to conclude a successful mission. The goal of STS-109 was to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the ACS, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation.

 

Landing Video Coverage

Download Real Media Player

 
56k Modem

Part 1 - 265Kb

Columbia touches down on Runway 33.
Columbia touches down on Runway 33. (Includes NASA Commentary)
Cable/Broadband

   Part 1 - 1.2Mb

 
 

Page Last Revised Page & Curator Information
March 14, 2002 Online coverage: Dennis Armstrong (NASA), Anna Heiney (IDI)
Web Development: Jeanne Ryba (NASA)
Video Production: Chris Chamberland (Photobition)
NASA Official: Dennis Armstrong (Dennis.Armstrong-1@ksc.nasa.gov)

A Service of the NASA/Kennedy Space Center
Roy D. Bridges, Director
NASA Home Page KSC Home Site Search Media archive FAQ/Contact Us NASA Centers