|
Orbiter:
Columbia
Mission: STS-109
Date: March 12, 2002
KENNEDY SPACE
CENTER, Fla. - A few hours after a flawless landing, STS-109 Commander
Scott Altman addressed the media during a post-landing press conference.
The goal of STS-109 was to service the HST, replacing Solar Array
2 with Solar Array 3, replacing the Power Control Unit, removing
the Faint Object Camera and installing the ACS, installing the
Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling
System, and installing New Outer Blanket Layer insulation.
|
Post-Landing Press
Conference
Download
Real Media Player
|
56k
Modem
Part
1 - 264Kb Part
2 - 277Kb
|

STS-109 Commander Scott Altman expresses
his thanks for a successful mission.
|
Cable/Broadband
Part
1 - 1.1Mb
Part
2 - 1.2Mb
|
|