Image: Live Countdown Coverage banner.
Image: Bar used to navigate KSC Links.

Orbiter: Columbia
Shuttle Mission: STS-109
Date:
March 1, 2002

KENNEDY SPACE CENTER, Fla. -– Image of Shuttle with American flag and launch complex in the background.On Launch Pad 39A, members of the STS-109 crew perform a final inspection of the Hubble payload they will deploy on orbit during five spacewalks. The crew comprises Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld, and Mission Specialists Nancy Currie, James Newman, Richard Linnehan and Michael Massimino. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation.

Live Countdown Coverage | Previous Countdown Events
Pre-Launch Video Table of Contents

Pre-launch Video Coverage
Payload Inspections
February 25, 2002

Download Real Media Player

 



56k Modem

291Kb

Walkdown of Shuttle Columbia's Payload.
Walkdown of Shuttle Columbia's Payload
(includes original audio)

   

   Cable/Broadband

   1.2Mb


     

STS-109 photos are online. (Note: This is a graphic-intensive site and may be difficult to view with low speed modems or when this web site receives heavy traffic loads).
Page Last Revised Page & Curator Information
March 12, 2003 Online coverage by: Dennis Armstrong (NASA), Anna Heiney (IDI)
Web Development: Lynda Warnock & Debbie Barton (FDC)
Video Production: Chris Chamberland (Photobition)
Countdown Clock by: Jim Fitzgerald (FDC)
NASA Official: Dennis Armstrong (Dennis.Armstrong-1@ksc.nasa.gov)

A Service of the NASA/Kennedy Space Center
Roy D. Bridges, Director
NASA Home Page Countdown Clock KSC Direct! Coverage KSC Home Site Search Media archive FAQ/Contact Us NASA Centers