|
Orbiter:
Columbia
Shuttle
Mission: STS-109
Date: March
1,
2002
KENNEDY
SPACE CENTER, Fla. -– On
Launch Pad 39A, members of the STS-109 crew perform a final
inspection of the Hubble payload they will deploy on orbit during
five spacewalks. The crew comprises Commander Scott Altman,
Pilot Duane Carey, Payload Commander John Grunsfeld, and Mission
Specialists Nancy Currie, James Newman, Richard Linnehan and
Michael Massimino. The goal of the mission is to replace Solar
Array 2 with Solar Array 3, replace the Power Control Unit,
remove the Faint Object Camera and install the Advanced Camera
for Surveys (ACS), install the Near Infrared Camera and Multi-Object
Spectrometer (NICMOS) Cooling System, and install New Outer
Blanket Layer insulation.
Live
Countdown Coverage
| Previous Countdown Events
Pre-Launch Video Table of Contents
|
STS-109
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads). |