|
Orbiter:
Columbia
Shuttle
Mission: STS-109
Date: March
1,
2002
KENNEDY
SPACE CENTER, Fla. -– STS-109
crew members don their orange launch and entry suits in preparation
for launch. The 11-day mission will provide maintenance and
upgrade to the Hubble Space Telescope, replacing Solar Array
2 with Solar Array 3, replacing the Power Control Unit, installing
the ACS (after removing the Faint Object Camera ), the Near
Infrared Camera, the Multi-Object Spectrometer (NICMOS) Cooling
System, and the New Outer Blanket Layer insulation.
Live
Countdown Coverage
| Previous Countdown Events
Pre-Launch Video Table of Contents
|
Launch
Video Coverage
Crew Suitup
March 1, 2002
Download
Real Media Player
56k
Modem
Part
1 - 262Kb
|

Suitup
of STS-109 Crew
(Includes Original Audio and Commentary)
|
Cable/Broadband
Part
1 - 1.1Mb
|
STS-109
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads).
|