|
Orbiter:
Columbia
Shuttle
Mission: STS-109
Date: March 1, 2002
KENNEDY
SPACE CENTER, Fla. -–
At Launch Pad 39A, the STS-109 crew takes part in the Terminal
Countdown Demonstration Test. During the test, the fully-suited
astronauts exit the Operations & Checkout Building and depart
for the launch pad. Once at the pad, they participate in a simulated
countdown, followed by emergency walkdown training in the slidewire
baskets that would carry them to safety in the event of an evacuation.
STS-109
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads).
Live
Countdown Coverage
| Previous Countdown Events
Pre-Launch Video Table of Contents
|
Pre-launch
Video Coverage
Terminal Countdown Demonstration Tests
January 30 - February 1, 2002
Download
Real Media Player
56k
Modem
Part
1 - 230Kb
Part 2 -
290Kb
Part 3 -
192Kb |

Crew
of STS-109 getting ready for Terminal Countdown Demonstration
Tests. (Original Audio)
|
Cable/Broadband
Part
1 - 1.1Mb
Part
2 - 1.3Mb
Part
3 - 852Kb |
|