|
Orbiter:
Endeavour
Shuttle
Mission: STS-111
Date: May 30, 2002
KENNEDY
SPACE CENTER, Fla. -– During the Terminal Countdown Demonstration
Test (TCDT) at KSC, the STS-111 and Expedition Five crews try
on their flight suits and take part in M113 armored vehicle
training. TCDT includes several safety training activities and
a simulated launch countdown. Known as Utilization Flight -2,
the mission includes attaching a Canadian-built mobile base
system to the International Space Station that will enable the
Canadarm2 robotic arm to move along a railway on the Station's
truss to build and maintain the outpost. The crew will also
replace a faulty wrist/roll joint on the Canadarm2 as well as
unload almost three tons of experiments and supplies from the
Italian-built Multi-Purpose Logistics Module Leonardo.
STS-111
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads).
TCDT
Video Page 2
Live Countdown Coverage
Pre-Launch Video Table of Contents
|
Pre-Launch
Video Coverage
Terminal Countdown Demonstration Test
May 14-17, 2002
Download
Real Media Player
56k
Modem
Part
1 - 256Kb
|

The
STS-111 crew members arrive at KSC in T-38 jets. (Includes
natural audio)
|
Cable/Broadband
Part
1 - 1.1Mb
|
56k
Modem
Part
1 - 185Kb
|

With
the help of technicians, the astronauts try on their
flight suits. (Includes natural audio)
|
Cable/Broadband
Part
1 - 803Kb
|
56k
Modem
Part
1 - 162Kb
|

The
crew members practice driving M113 armored personnel
carriers. (Includes natural audio)
|
Cable/Broadband
Part
1 - 682Kb |
|