|
Orbiter:
Endeavour
Shuttle
Mission: STS-111
Date: May 30, 2002
KENNEDY
SPACE CENTER, Fla. -– During the Terminal Countdown Demonstration
Test (TCDT) at KSC, the STS-111 and Expedition Five crews participate
in a pad safety walkdown and emergency egress training. TCDT
includes several safety training activities and a simulated
launch countdown. Known as Utilization Flight -2, the mission
includes attaching a Canadian-built mobile base system to the
International Space Station that will enable the Canadarm2 robotic
arm to move along a railway on the Station's truss to build
and maintain the outpost. The crew will also replace a faulty
wrist/roll joint on the Canadarm2 as well as unload almost three
tons of experiments and supplies from the Italian-built Multi-Purpose
Logistics Module Leonardo.
STS-111
photos are online. (Note:
This is a graphic-intensive site and may be difficult to view
with low speed modems or when this web site receives heavy traffic
loads).
TCDT
Video Page 1
Live
Countdown Coverage
Pre-Launch Video Table of Contents
|
Pre-Launch
Video Coverage
Terminal Countdown Demonstration Test
May 14-17, 2002
Download
Real Media Player
56k
Modem
Part
1 - 295Kb
|

The
astronauts participate in a pad safety walkdown. (Includes
natural audio)
|
Cable/Broadband
Part
1 - 1.3Mb
|
56k
Modem
Part
1 - 321Kb
|

Emergency
egress training includes trying out the pad's slidewire
baskets. (Includes natural audio)
|
Cable/Broadband
Part
1 - 1.4Mb
|
56k
Modem
Part
1 - 224Kb
Part 2
- 223Kb
|

Commander
Ken Cockrell speaks about the upcoming mission. (Includes
natural audio)
|
Cable/Broadband
Part
1 - 979Kb
Part
2 - 944Kb |
|