Image: Live Countdown Coverage banner.
Image: Bar used to navigate KSC Links.

Orbiter: Atlantis
Shuttle Mission: STS-112
Date: October 7, 2002

Image: Montage of images including the Space Shuttle and American FlagKENNEDY SPACE CENTER, Fla. -– Less than one day before launch, the Rotating Service Structure at Launch Pad 39B is rolled back, revealing Space Shuttle Atlantis as it sits poised for liftoff. STS-112 is the 15th assembly flight to the International Space Station, carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. On the 11-day mission, three spacewalks are planned to attach the S1 truss to the Station.

Pre-Launch Video Coverage
RSS Rollback
October 6, 2002

Download Real Media Player

56k Modem

Part 1 - 288Kb

						Image: RSS Rollback
Space Shuttle Atlantis is poised for launch following RSS rollback. (Includes natural audio)
   Cable/Broadband

   Part 1 - 1.2Mb
   


STS-112 photos are online. (Note: This is a graphic-intensive site and may be difficult to view with low speed modems or when this web site receives heavy traffic loads).



Live Countdown Coverage
Pre-Launch Video Table of Contents

Page Last Revised Page & Curator Information
October 21, 2002 Online coverage by: Dennis Armstrong (NASA), Anna Heiney (IDI)
Web Development: Lynda Warnock & Debbie Barton (FDC)
Video Production: Chris Chamberland & Mike Chambers (Johnson Controls)
Countdown Clock by: Jim Fitzgerald (FDC)
NASA Official: Dennis Armstrong (Dennis.Armstrong-1@ksc.nasa.gov)

A Service of the NASA/Kennedy Space Center
Roy D. Bridges, Director
NASA Home Page Countdown Clock KSC Direct! Coverage KSC Home Site Search Media archive FAQ/Contact Us NASA Centers