      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, DECEMBER 7, 1994 (11:32 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 ORBITAL ALTITUDE: 196 sm LOCATION: OPF bay 2 INCLINATION: 51.60 degrees TARGET LAUNCH DATE: Feb. 2, 1995 CREW SIZE: 6 LAUNCH TIME: 12:51 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10/7:05 a.m. MISSION DURATION: 8D/6H/13M IN WORK TODAY: Install left hand orbital maneuvering system pod Payload interface verification test Begin orbiter aft engine compartment closeouts Potable water servicing WORK COMPLETED: Transport left hand orbital maneuvering system pod to OPF Main engine securing and inspections Install main engine heatshields WORK SCHEDULED: Orbital maneuvering system pod interface verification test Crew equipment interface test MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 ORBITAL ALTITUDE: 218 sm LOCATION: OPF bay 1 INCLINATION: 28.45 degrees TARGET LAUNCH PERIOD: early March CREW SIZE: 7 APPROX. LAUNCH TIME: very early morning LAUNCH WINDOW: 2H/3M KSC LANDING DATE/TIME: TBD MISSION DURATION: 15D/13H IN WORK TODAY: Payload premate tests Main propulsion system verification checks Nose wheel steering checks Hydraulic system fill and bleed Stack solid rocket boosters in Vehicle Assembly Building WORK SCHEDULED: Install auxiliary power unit no. 1 Preparations to install main engines WORK COMPLETED: Water spray boiler installation Electrical mates of the extended duration orbiter pallet Payload bay closeouts Functional checks of orbital maneuvering system pods MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 ORBITAL ALTITUDE: 196-245 sm LOCATION: OPF bay 3 INCLINATION: 51.60 degrees TARGET LAUNCH PERIOD: late May CREW SIZE: 7/8 APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9D/20H IN WORK TODAY: Orbiter structural checks Fuel cell checks WORK COMPLETED: Remove payloads Forward reaction control system functional test Initial inspections of orbiter docking system Open payload bay doors WORK SCHEDULED: Cycle payload bay doors

      GO TO THE STATUS REPORTS HOME PAGE