      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT THURSDAY, DECEMBER 8, 1994 (11:43 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 ORBITAL ALTITUDE: 196 sm LOCATION: OPF bay 2 INCLINATION: 51.60 degrees TARGET LAUNCH DATE: Feb. 2, 1995 CREW SIZE: 6 LAUNCH TIME: 12:51 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10/7:05 a.m. MISSION DURATION: 8D/6H/13M IN WORK TODAY: Payload interface verification test Spartan electrical connector checks Orbital maneuvering system pod interface verification test Aft engine compartment close-outs Install main engine heatshields WORK COMPLETED: Install left hand orbital maneuvering system pod Potable water servicing Main engine securing and inspections WORK SCHEDULED: Crew equipment interface test Orbital maneuvering system pod crossfeed connections Close payload bay doors for flight MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 ORBITAL ALTITUDE: 218 sm LOCATION: OPF bay 1 INCLINATION: 28.45 degrees TARGET LAUNCH PERIOD: early March CREW SIZE: 7 APPROX. LAUNCH TIME: very early morning LAUNCH WINDOW: 2H/3M KSC LANDING DATE/TIME: TBD MISSION DURATION: 15D/13H IN WORK TODAY: Payload premate tests Main propulsion system verification checks Extended duration orbiter pallet leak checks Stack solid rocket boosters in Vehicle Assembly Building WORK SCHEDULED: Clear bay for work on disconnecting auxiliary power unit no. 1 Install ASTRO-2 payload Begin aft engine compartment close-outs Preparations to install main engines WORK COMPLETED: Hydraulic flight control tests Water spray boiler installation Nose wheel steering checks Payload bay close-outs Functional checks of orbital maneuvering system pods MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 ORBITAL ALTITUDE: 196-245 sm LOCATION: OPF bay 3 INCLINATION: 51.60 degrees TARGET LAUNCH PERIOD: late May CREW SIZE: 7/8 APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9D/20H IN WORK TODAY: Orbiter structural checks Main propulsion system verification checks Remove remote manipulator system Main engine pump torque checks WORK COMPLETED: Fuel cell leak checks Remove payloads Open payload bay doors WORK SCHEDULED: Cycle payload bay doors Off load hypergolic reactants

      GO TO THE STATUS REPORTS HOME PAGE