GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORTGO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT FRIDAY, DECEMBER 9, 1994 (11:16 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 LOCATION: OPF bay 2 TARGET LAUNCH DATE/TIME: Feb. 2, 1995 at 12:51 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10 at 7:05 a.m. MISSION DURATION: 8 days, 6 hours, 13 minutes CREW SIZE: 6 ORBITAL ALTITUDE: 196 statute miles INCLINATION: 51.60 degrees IN WORK TODAY: Spartan electrical interface modification Orbital maneuvering system pod interface verification test Aft engine compartment close-outs and final engine checks Auxiliary power unit no. 2 inspections and verifications WORK COMPLETED: Install main engine heatshields Install left hand orbital maneuvering system pod Potable water servicing Main engine securing and inspections WORK SCHEDULED NEXT WEEK: Crew equipment interface test (Saturday) Complete payload interface verification checks Main engine clearance and final aerosurface checks Orbital maneuvering system pod crossfeed connections Orbiter mid-body close-outs Close payload bay doors for flight MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 LOCATION: OPF bay 1 TARGET LAUNCH PERIOD: early March APPROX. LAUNCH TIME: very early morning LAUNCH WINDOW: 2 hours, 3 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 15 days, 13 hours CREW SIZE: 7 ORBITAL ALTITUDE: 218 statute miles INCLINATION: 28.45 degrees IN WORK TODAY: Clear bay for work on disconnecting auxiliary power unit no. 1 Stack solid rocket boosters in Vehicle Assembly Building WORK COMPLETED: Extended duration orbiter pallet leak checks Hydraulic flight control tests Water spray boiler installation Nose wheel steering checks Payload bay close-outs Functional checks of orbital maneuvering system pods WORK SCHEDULED NEXT WEEK: Continue payload premate tests Install ASTRO-2 payload and interface verification checks Continue main propulsion system verification checks Begin aft engine compartment close-outs Begin preparations to install main engines MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: OPF bay 3 TARGET LAUNCH PERIOD: late May APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9 days, 20 hours CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE: 196-245 statute miles INCLINATION: 51.60 degrees IN WORK TODAY: Orbiter structural checks Main propulsion system verification checks Main engine pump torque checks Close payload bay doors WORK COMPLETED: Remove remote manipulator system Fuel cell leak checks Remove payloads WORK SCHEDULED NEXT WEEK: Off load hypergolic reactants Open payload bay doors Remove and replace orbital maneuvering system thrusters