      SPACE SHUTTLE STATUS REPORT Tuesday, December 13, 1994 Mission number: STS-63 Vehicle: OV-103/Discovery Location: OPF Bay 2 Orbital altitude: 196 sm Primary payload: Spacehab-3/Spartan Inclination: 51.6 degrees Launch date: Feb. 2 12:51 a.m. Landing: Feb. 10 7:05 a.m. Mission duration: 8 days, 6 hrs. Crew Size: 6 STS-63 IN WORK: aft main engine compartment closeouts orbiter mid-body closeouts test of orbiter hydraulics and flight controls checks of orbital maneuvering system crossfeed system preparations to remove auxiliary power unit No. 2 STS-63 WORK SCHEDULED: removal of auxiliary power unit No. 2 (Wednesday) final payload closeouts (Wednesday-Thursday) payload bay door closure (Friday) STS-63 WORK COMPLETED: Crew Equipment Interface Test (CEIT) Spartan Interface Verification Test (IVT) re-test potable water servicing ENDEAVOUR (STS-67) Astro-2 In the Operations and Checkout Building, the Astro-2 payload is being installed into the payload canister today in preparation for going to the orbiter processing facility Wednesday morning. Installation into the payload bay of Endeavour is scheduled for Wednesday evening. Cleaning of Endeavour's payload bay is underway today in preparation for the Astro-2 installation. ATLANTIS (STS-71) MIR DOCKING Preparations are underway for hypergolic system deservicing and removal of the three auxiliary power units scheduled to occur later this week. KSC 24-Hour Weather Summary Today's minimum temperature: 51 degrees Yesterday's maximum temperature: 76 degrees Lowest relative humidity: 46 percent Peak wind speed: ENE-21 mph Precipitation as of 7 a.m.: 0 inches Total December precipitation: .54 inches

      GO TO THE STATUS REPORTS HOME PAGE