GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      

      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT


      SPACE SHUTTLE STATUS REPORT Wednesday, December 14, 1994 Mission Number: STS-63 Vehicle: OV-103/Discovery Location: OPF Bay 2 Orbital altitude: 196 sm Primary payload: Spacehab-3/Spartan Inclination: 51.6 degrees Launch date: Feb. 2 12:51 a.m. Landing: Feb. 10 7:05 a.m. Mission duration: 8 days, 6 hrs. Crew Size: 6 STS-63 IN WORK: installation of window No. 8 orbiter mid-body closeouts final payload bay cleaning and closeouts removal of auxiliary power unit No. 2 Spartan electrical closeouts main engine No. 1 nozzle x-rays and borescoping aft compartment insulation foaming STS-63 WORK SCHEDULED: payload bay door radiator closeouts (Thursday) payload bay door closure (Friday) STS-63 WORK COMPLETED: Spacehab closeouts test of orbiter hydraulic systems and flight controls Ku-band antenna testing ENDEAVOUR (STS-67) Astro-2 The Astro-2 payload is being installed into Endeavour's payload bay today. ATLANTIS (STS-71) MIR DOCKING The electrical configuration of the forward bulkhead for the orbiter docking system is underway. In the Vehicle Assembly Building the electrical checkout of the orbiter docking system is continuing. Preparations are underway for hypergolic system deservicing and removal of the three auxiliary power units tomorrow. KSC 24-Hour Weather Summary Today's minimum temperature: 55 degrees Yesterday's maximum temperature: 61 degrees Lowest relative humidity: 90 percent Peak wind speed: NW-18 mph Precipitation as of 7 a.m.: Trace Total December precipitation: .54 inches NOTE: Christmas holidays for the launch team begin Dec. 23 and extend until Jan. 3. There will be no orbiter processing activity during that time. No status reports will be issued.

      GO TO THE STATUS REPORTS HOME PAGE