KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, NOVEMBER 30, 1994 (11:45 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 ORBITAL ALTITUDE: 196 sm LOCATION: OPF bay 2 INCLINATION: 51.60 degrees TARGET LAUNCH DATE: Feb. 2, 1995 CREW SIZE: 6 LAUNCH TIME: 12:51 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10/7:05 a.m. MISSION DURATION: 8D/6H/13M IN WORK TODAY: Main engine securing and inspections Install main engine heatshields Spacehab module mate to orbiter Preparations to transport and install left hand orbital maneuvering system WORK SCHEDULED: Install left hand orbital maneuvering system pod Payload interface verification test WORK COMPLETED: Transport payloads to Orbiter Processing Facility Install SPARTAN and Spacehab payloads Crew module and spacehab leak tests Water spray boiler checks Remote manipulator system functional checks and deploy MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 ORBITAL ALTITUDE: 218 sm LOCATION: OPF bay 1 INCLINATION: 28.45 degrees TARGET LAUNCH PERIOD: early March CREW SIZE: 7 APPROX. LAUNCH TIME: very early morning LAUNCH WINDOW: 2H/3M KSC LANDING DATE/TIME: TBD MISSION DURATION: 15D/13H IN WORK TODAY: Install water spray boilers Begin auxiliary power unit servicing Main propulsion system verification checks Stack solid rocket boosters in Vehicle Assembly Building WORK SCHEDULED: Functional checks of orbital maneuvering system pods Payload premate tests WORK COMPLETED: Ku-band checks Install extended duration orbiter pallet Fuel cell no. 3 functional checks Electrical mates of the extended duration orbiter pallet MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 ORBITAL ALTITUDE: 196-245 sm LOCATION: OPF bay 3 INCLINATION: 51.60 degrees TARGET LAUNCH PERIOD: late May CREW SIZE: 7/8 APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9D/20H IN WORK TODAY: Frequency response test Install payload door strongbacks and preparations to open payload bay doors Initial inspections of orbiter docking system Orbiter structural checks WORK COMPLETED: Remove engine tailcone Jack and leveling of orbiter in Orbiter Processing Facility Receiving inspections of orbiter docking system Access aft engine compartment WORK SCHEDULED: Open payload bay doors Remove payloads