      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, OCTOBER 19, 1994 (10:54 AM EDT) MISSION: STS-68 -- SPACE RADAR LABORATORY-2 VEHICLE: Endeavour/OV-105 LOCATION: Edwards Air Force Base, Calif. KSC LAUNCH DATE and TIME: Sept. 30, 1994 at 7:16 a.m. EDT EDWARDS LANDING DATE and TIME: Oct. 11 at 1:02 p.m. EDT MISSION ELAPSED TIME (MET): 11 days/5 hours/47 minutes/8 seconds The orbiter Endeavour is mated to the 747 Shuttle Carrier Aircraft at Edwards Air Force Base, Calif. Departure from Edwards is being discussed as weather en route is assessed. The itinerary back to Kennedy Space Center will be determined at a weather briefing to be held late this morning at Edwards. At least a two day ferry flight back to Kennedy Space Center is anticipated. MISSION: STS-66 -- ATLAS-3/CRISTA-SPAS VEHICLE: Atlantis/OV-104 ORBITAL ALTITUDE: 189 sm LOCATION: Pad 39B INCLINATION: 57 degrees TARGET LAUNCH DATE: Nov. 3 CREW SIZE: 6 LAUNCH TIME: 11:56 a.m. EST LAUNCH WINDOW: 1 hour/2 minutes TARGET KSC LANDING DATE/TIME: Nov. 14/7:42 a.m. MISSION DURATION: 10 days/20 hours IN WORK TODAY: Pad closed to load hypergolic fuels Flight Readiness Review WORK SCHEDULED: Helium signature test (rescheduled for Saturday) Open rotating service structure Hot fire three auxiliary power units WORK COMPLETED: Close payload bay doors Preparations to load hypergolic fuels Calibrate inertial measurement units Cavity purges and leak checks ATLAS payload battery charge Payload interface verification tests Water spray boiler inspections MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 ORBITAL ALTITUDE: 196 sm LOCATION: OPF bay 2 INCLINATION: 51.60 degrees TARGET LAUNCH PERIOD: early February CREW SIZE: 6 APPROX. LAUNCH TIME: very early morning KSC LANDING DATE/TIME: TBD LAUNCH WINDOW: 5 minutes MISSION DURATION: 8 days/4 hours IN WORK TODAY: Install drag chute Preparations to remove forward reaction control system Preparations to off-load hypergolic fuels WORK SCHEDULED: Remove forward reaction control system Off-load residual hypergolic fuels WORK COMPLETED: Hydraulic operations Remove space shuttle main engines and heatshields

      GO TO THE STATUS REPORTS HOME PAGE