KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT THURSDAY, OCTOBER 27, 1994 (2:53 PM EDT) MISSION: STS-66 -- ATLAS-3/CRISTA-SPAS VEHICLE: Atlantis/OV-104 ORBITAL ALTITUDE: 189 sm LOCATION: Pad 39B INCLINATION: 57 degrees LAUNCH DATE: Nov. 3 CREW SIZE: 6 LAUNCH TIME: 11:56 a.m. EST LAUNCH WINDOW: 1 hour/2 minutes KSC LANDING DATE/TIME: Nov. 14/7:42 a.m. MISSION DURATION: 10 days/20 hours NOTE: Managers have decided to perform a special torque test on Atlantis' three water spray boilers. Six water valves (2 on each boiler) and the associated piping will be checked for potential weaknesses or corrosion. The test was deemed necessary following discovery of a failed valve on one of Endeavour's boilers. Aft close-out work will be extended through the weekend. No impact to launch is expected. IN WORK TODAY: Purge external tank Aft engine compartment close-outs Water spray boiler inspections WORK SCHEDULED: Complete aft close-outs Final payload servicing for flight Close payload bay doors for flight WORK COMPLETED: Pressurize hypergolic reactant tanks Install and check-out contingency space suits Airlock close-outs Ordnance Installation Load hypergolic fuels MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 ORBITAL ALTITUDE: 196 sm LOCATION: OPF bay 2 INCLINATION: 51.60 degrees TARGET LAUNCH PERIOD: early February CREW SIZE: 6 APPROX. LAUNCH TIME: very early morning KSC LANDING DATE/TIME: TBD LAUNCH WINDOW: 5 minutes MISSION DURATION: 8 days/4 hours IN WORK TODAY: Preparations to off-load hypergolic fuels Auxiliary power unit leak and functional checks Functional checks of the orbital maneuvering system Stack solid rocket boosters in Vehicle Assembly Building WORK SCHEDULED: Install drag chute Off-load residual hypergolic reactants WORK COMPLETED: Power reactant and storage distribution system tests Ammonia servicing MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 ORBITAL ALTITUDE: 218 sm LOCATION: OPF bay 1 INCLINATION: 28.45 degrees TARGET LAUNCH PERIOD: late February CREW SIZE: 7 APPROX. LAUNCH TIME: very early morning KSC LANDING DATE/TIME: TBD LAUNCH WINDOW: 2 hours/3 minutes MISSION DURATION: 13 D/14H IN WORK TODAY: Post-mission inspections Deservice water spray boilers Main engine and aerosurface repositioning WORK SCHEDULED: Remove main engine heatshields Remove STS-68 payloads Off-load residual hypergolic reactants WORK COMPLETED: Remove water spray boiler no. 3. Open payload bay doors Remove tailcone