      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, APRIL 5, 1995 (10:55 AM EST) MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH DATE: June 2 (no earlier than) APPROX. LAUNCH TIME: 1:45 a.m. LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: June 12 at 9:15 p.m. MISSION DURATION: 10 days, 19 hours, 31 minutes CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Aft engine compartment close-outs Install main engine heatshields Spacelab close-outs Tunnel connections and electrical checks WORK COMPLETED: Install Mir/Spacelab tunnel KEY OPERATIONAL MILESTONES (dates are targeted only): Crew equipment interface test (April 8-9) Final payload bay closure (April 12) Roll to Vehicle Assembly Building (April 19) Roll to Launch Pad 39-A (April 26) MISSION: STS-70 -- TDRS-G VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE: June 22 APPROX. LAUNCH TIME: 11:13 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: June 30 at 9:23 a.m. MISSION DURATION: 8 days CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees IN WORK TODAY: Preparations for possible move to Vehicle Assembly Building for temporary storage Auxiliary power unit leak and functional checks Ammonia servicing Solid rocket booster stacking operations in Vehicle Assembly Building high bay 3 WORK COMPLETED: Payload premate tests WORK SCHEDULED: Possible transfer to Vehicle Assembly Building for temporary storage (April 12) MISSION: STS-69 -- WSF-2 & SPARTAN 201-03 VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE: July 20 APPROX. LAUNCH TIME: 12:06 p.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: July 31 at 8:37 a.m. MISSION DURATION: 10 days, 21 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 190 statute miles/28.45 degrees IN WORK TODAY: Remove ASTRO-2 payload Post-flight inspections Preparations to remove main engines Functional checks of the forward reaction control system Continue access to aft engine compartment WORK SCHEDULED: Remove main engines (April 10) Remove extended duration orbiter pallet (April 11) NOTE: The orbiter Columbia is expected to begin its ferry flight from Palmdale, Calif., to KSC on April 11 with an arrival at the Shuttle Landing Facility targeted for mid-day April 12. Columbia has spent the last six months undergoing structural inspections and modifications at the Rockwell facility in Palmdale. Columbia’s next mission is STS-73, a 16-day flight targeted for launch in September.

      GO TO THE STATUS REPORTS HOME PAGE