GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORTGO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT MONDAY, APRIL 10, 1995 (12:13 PM EST) NOTE: Missions STS-71 and STS-70 are both being targeted for no earlier than launch dates and options are being protected for each to be the next one launched. A more firm decision is expected within the next two weeks. MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH DATE: June 10 (no earlier than) APPROX. LAUNCH TIME: 10:12 p.m. LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: June 21 at 5:41 p.m. MISSION DURATION: 10 days, 19 hours, 31 minutes CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Aft engine compartment close-outs Install main engine heatshields Spacelab final close-outs Preparations for crew equipment interface test WORK COMPLETED: Crew equipment interface test Tunnel leak checks Final flight control checks KEY OPERATIONAL MILESTONES (dates are target only): Final payload bay closure (April 13) Roll orbiter to Vehicle Assembly Building (April 19) Roll Shuttle vehicle to Launch Pad 39-A (April 25) MISSION: STS-70 -- TDRS-G VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE: June 8 (no earlier than) APPROX. LAUNCH TIME: 10:23 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: June 16 at 8:33 a.m. MISSION DURATION: 8 days CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees IN WORK TODAY: Auxiliary power unit leak and functional checks Water spray boiler checks Solid rocket booster stacking operations in Vehicle Assembly Building high bay 3 WORK COMPLETED: Landing gear checks Waste collection system installation KEY OPERATIONAL MILESTONES (dates are target only): Mate external tank to solid rocket boosters in Vehicle Assembly Building (Thursday) Install shuttle main engines (April 17) Roll orbiter to Vehicle Assembly Building (May 3) Roll Shuttle vehicle to Launch Pad 39-B (May 11) MISSION: STS-69 -- WSF-2 & SPARTAN 201-03 VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE: July 20 APPROX. LAUNCH TIME: 12:06 p.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: July 31 at 8:37 a.m. MISSION DURATION: 10 days, 21 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 190 statute miles/28.45 degrees IN WORK TODAY: Extended duration orbiter pallet demate preparations Preparations to remove main engines Functional checks of the forward reaction control system WORK SCHEDULED: Remove extended duration orbiter pallet (Wednesday) Remove main engines (Wednesday) NOTE: The orbiter Columbia is expected to begin its ferry flight from Palmdale, Calif., to KSC on Tuesday, April 11, with arrival at the Shuttle Landing Facility targeted for late-morning April 12. Columbia is scheduled to make an overnight stop at Ellington Field in Houston, Texas, weather permitting. Columbia has spent the last six months undergoing structural inspections and modifications at the Rockwell facility in Palmdale. Columbia’s next mission is STS-73, a 16-day flight targeted for launch in September. Upon arrival, Columbia will be stored temporarily in the Vehicle Assembly Building until Atlantis is rolled out of the Orbiter Processing Facility for external tank mating operations.