GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      

      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT


      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT FRIDAY, JANUARY 13, 1995 (11:34 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 LOCATION: Pad 39B TARGET LAUNCH DATE/TIME: Feb. 2, 1995 at 12:49 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10 at 7:05 a.m. MISSION DURATION: 8 days, 6 hours, 13 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Main engine frequency response test Launch readiness review Securing auxiliary power unit no. 2 WORK COMPLETED: Solid rocket booster portion of the flight readiness test Shuttle interface verification test WORK SCHEDULED NEXT WEEK: Helium signature test (Monday) Remove leaking thruster R3A (Tuesday) Flight Readiness Review (Wednesday) Crew arrives for Terminal Countdown Demonstration Test (9:30 a.m. Tuesday) Terminal Countdown Demonstration Test (Wednesday-Thursday) Pre-launch hypergolic propellant load (Friday) KEY OPERATIONAL MILESTONES SCHEDULED FOR JANUARY (dates are targeted only): Hot fire auxiliary power unit no. 2 (Jan. 22) Countdown begins (4:30 p.m. Jan. 29) Crew arrival for launch (12 midnight Jan. 29) MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 LOCATION: OPF bay 1 TARGET LAUNCH DATE: March 2 APPROX. LAUNCH TIME: 1:37 a.m. LAUNCH WINDOW: 2 hours, 30 minutes KSC LANDING DATE/TIME: March 18 at 3:09 p.m. MISSION DURATION: 15 days, 13 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 218 statute miles/28.45 degrees IN WORK TODAY: Aft engine compartment close-outs Preparations to remove and repair a signal conditioner on the right hand orbital maneuvering system pod Final payload bay cleaning WORK COMPLETED: Securing of main engine no. 3 following installation Payload end-to-end tests WORK SCHEDULED NEXT WEEK: Remove and repair right hand orbital maneuvering system pod (Monday) Final closure of payload bay doors (Wednesday) MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: OPF bay 3 TARGET LAUNCH PERIOD: May/June APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9 days, 20 hours CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Remove and replace six ball screw housings on the orbiter docking system (ODS) in the Vehicle Assembly Building Main propulsion system leak and functional checks WORK COMPLETED: Remove auxiliary power units Fuel cell no. 2 functional checks WORK SCHEDULED NEXT WEEK: Reconfigure payload bay for ODS installation next month

      GO TO THE STATUS REPORTS HOME PAGE