      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT TUESDAY, JANUARY 17, 1995 (11:36 AM EST) MISSION: STS-63 -- MIR RENDEZVOUS, SPARTAN and SPACEHAB-3 VEHICLE: Discovery/OV-103 LOCATION: Pad 39B TARGET LAUNCH DATE/TIME: Feb. 2, 1995 at 12:49 a.m. EST LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: Feb. 10 at 7:05 a.m. MISSION DURATION: 8 days, 6 hours, 13 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Securing and leak checks on auxiliary power unit no. 2 (Yesterday, a leak was found on APU no. 2 in the area of the fuel pump assembly. Workers plan to pinpoint and seal the leak today.) Remove and replace leaking thruster R3A WORK COMPLETED: Crew arrival for Terminal Countdown Demonstration Test (9:30 a.m. today) Main engine flight readiness test Helium signature test Launch readiness review WORK SCHEDULED THIS WEEK: Flight Readiness Review (Wednesday) Terminal Countdown Demonstration Test (Wednesday-Thursday) Pre-launch hypergolic propellant load (Friday) KEY OPERATIONAL MILESTONES SCHEDULED FOR JANUARY (dates are targeted only): Hot fire auxiliary power unit no. 2 (Jan. 22) Countdown begins (4:30 p.m. Jan. 29) Crew arrival for launch (12 midnight Jan. 29) MISSION: STS-67 -- ASTRO-2 VEHICLE: Endeavour/OV-105 LOCATION: OPF bay 1 TARGET LAUNCH DATE: March 2 APPROX. LAUNCH TIME: 1:37 a.m. LAUNCH WINDOW: 2 hours, 30 minutes KSC LANDING DATE/TIME: March 18 at 3:09 p.m. MISSION DURATION: 15 days, 13 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 218 statute miles/28.45 degrees IN WORK TODAY: Remove and repair signal conditioner on right hand orbital maneuvering system pod Aft engine compartment close-outs Final payload bay cleaning and close-outs WORK COMPLETED: Securing of main engine no. 3 following installation Auxiliary power unit no. 1 connections WORK SCHEDULED: Reinstall right hand orbital maneuvering system pod Final closure of payload bay doors MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: OPF bay 3 TARGET LAUNCH PERIOD: May/June APPROX. LAUNCH TIME: early morning LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 9 days, 20 hours CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Main propulsion system leak and functional checks Install auxiliary power units WORK COMPLETED: Remove and replace six ball screw housings on the orbiter docking system (ODS) in the Vehicle Assembly Building Remove auxiliary power units Fuel cell no. 2 functional checks WORK SCHEDULED: Docking system functional test Reconfigure payload bay for ODS installation next month

      GO TO THE STATUS REPORTS HOME PAGE