June 19, 1995 Shuttle Status Report
GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORTGO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT MONDAY, JUNE 19, 1995 (3:35 PM EDT) MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Launch Pad 39-A TARGET LAUNCH DATE: June 23 APPROX. LAUNCH TIME: 5:08.37 p.m. EDT LAUNCH WINDOW: 7 minutes TARGET KSC LANDING DATE/TIME: July 4 at 12 noon MISSION DURATION: 10 days, 18 hours, 52 minutes CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees NOTE: Mission managers selected Friday, June 23, as the official launch date for Atlantis on mission STS-71. The countdown for launch will begin at 9:30 a.m. Tuesday for a 7 minute launch window opening at 5:08.37 p.m. on June 23. Docking with Russia’s Mir space station will occur on Monday, June 26, at about 10:30 a.m. and landing will be at about 12 noon July 4. IN WORK TODAY: * Countdown preparations * Potable water sampling WORK COMPLETED: * Aft engine compartment close-outs KEY OPERATIONAL MILESTONES: * Begin countdown at T-43 hours (9:30 a.m. Tuesday) * Crew arrival (4:30 p.m. Tuesday) * Move rotating service structure to launch position (about 8:30 p.m. Thursday) * External tank loading operations (about 7:45 a.m. Friday) MISSION: STS-70 -- TDRS-G VEHICLE: Discovery/OV-103 LOCATION: Pad 39-B LAUNCH DATE/TIME: July 13 at 9:41 a.m. LAUNCH WINDOW: 2 hours, 30 minutes KSC LANDING DATE/TIME: July 21 at 7:51 a.m. MISSION DURATION: 7 days, 22 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees IN WORK TODAY: * TDRS interface verification testing WORK COMPLETED: * Pad validations * Install TDRS satellite into orbiter * Orbiter mid-body umbilical unit mate and leak checks KEY OPERATIONAL MILESTONES (dates are target only): * Space Shuttle main engine flight readiness test (June 26) MISSION: STS-69 -- WSF-2 & SPARTAN 201-03 VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE/TIME: July 30 at 10:40 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: August 10 at 7:10 a.m. MISSION DURATION: 10 days, 20 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 230 statute miles/28.45 degrees NOTE: Close-outs of the orbiter’s mid-body and aft engine compartment continue today. The payload bay doors will be closed today. KEY OPERATIONAL MILESTONES (dates are target only): * Roll orbiter to Vehicle Assembly Building (June 26) MISSION: STS-73 -- U.S. MICROGRAVITY LABORATORY-2 VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH DATE/TIME: Sept. 21 at 10:37 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: Oct. 7 at 8:31 a.m. MISSION DURATION: 16 days CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 172 statute miles/39 degrees