KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, MARCH 8, 1995 (12:05 PM EST) MISSION: STS-67 -- ASTRO-2 FLIGHT DAY 7 VEHICLE: Endeavour/OV-105 LOCATION: en orbit LAUNCH DATE and TIME: March 2 at 1:38 a.m. EST KSC LANDING DATE and TIME: March 17 at 3:10 p.m. MISSION DURATION: 15 days, 13 hours, 32 minutes ORBITAL ALTITUDE and INCLINATION: 218 statute miles/28.45 degrees Mission STS-67 status reports are issued daily by the Johnson Space Center, Houston, Tx. ASTRO-2 payload status reports are issued by the Marshall Space Flight Center, Huntsville, Ala. STS-67 crew: Commander Stephen Oswald, Pilot William Gregory, Payload Commander Tamara Jernigan, Mission Specialist John Grunsfeld, Mission Specialist Wendy Lawrence, Payload Specialist Samuel Durrance, Payload Specialist Ronald Parise. MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH PERIOD: May/June APPROX. LAUNCH PERIOD: late night LAUNCH WINDOW: 5 minutes KSC LANDING DATE/TIME: TBD MISSION DURATION: 10 days, 19 hours, 31 minutes CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: Payload premate tests Install Spacelab tunnel adapter and tunnel extension WORK COMPLETED: Orbiter hydraulic operations and flight control checks Stack solid rocket boosters in Vehicle Assembly Building Service replacement Freon/water interchanger and coolant loops Orbiter Docking System lift and balance checks KEY OPERATIONAL MILESTONES (dates are targeted only): Transport Orbiter Docking System to Orbiter Processing Facility (Thursday) Install Orbiter Docking System into orbiter in Orbiter Processing Facility (Monday) Mate external tank with solid rocket boosters in VAB (Monday) Install spacelab into orbiter (March 17) Docking system test (March 29) Crew equipment interface test (April 7) Final payload bay closure (April 12) Roll to Vehicle Assembly Building (April 18) MISSION: STS-70 -- TDRS-G VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE: June 22 APPROX. LAUNCH TIME: 11:13 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: June 30 at 9:23 a.m. MISSION DURATION: 8 days CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees IN WORK TODAY: Main propulsion system leak and functional checks Orbital maneuvering system pod functional checks WORK COMPLETED: Remove robotic arm