GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      

      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT


      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT TUESDAY, MAY 30, 1995 (12:18 PM EDT) MISSION: STS-70 -- TDRS-G VEHICLE: Discovery/OV-103 LOCATION: Launch Pad 39-B LAUNCH DATE: June 8 LAUNCH TIME: 9:26 a.m. EDT LAUNCH WINDOW: 2 hours, 30 minutes KSC LANDING DATE/TIME: June 16 at 7:36 a.m. MISSION DURATION: 7 days, 22 hours, 10 minutes CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees IN WORK TODAY: · Aft engine compartment close-outs · Countdown preparations · TDRS battery charging operations WORK COMPLETED: · Flight readiness review · Inertial measurement unit calibrations · Ordnance installation operations (part 1) KEY OPERATIONAL MILESTONES (dates are target only): · Install and check-out contingency spacesuits (June 1) · Close payload bay doors for flight (June 5) · Countdown begins (6 a.m. June 5) · Crew arrival for launch (6 p.m. June 5) MISSION: STS-71 -- 1st MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Launch Pad 39-A TARGET LAUNCH DATE: June 22 (no earlier than) APPROX. LAUNCH TIME: 5:31 p.m. EDT LAUNCH WINDOW: 5 minutes TARGET KSC LANDING DATE/TIME: July 3 at 1 p.m. MISSION DURATION: 10 days, 19 hours, 31 minutes CREW SIZE: 7 up, 8 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.60 degrees IN WORK TODAY: · Preparations for helium signature test WORK COMPLETED: · Leak checks on the high pressure fuel turbo pump on main engine no. 3 · Terminal Countdown Demonstration Test · Inertial measurement unit calibrations KEY OPERATIONAL MILESTONES (dates are target only): · Space Shuttle main engine flight readiness test (June 1) · Flight readiness review (June 2) · Begin orbiter engine compartment close-outs (June 6) MISSION: STS-69 -- WSF-2 & SPARTAN 201-03 VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE/TIME: July 20 at 10:30 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: July 31 at 7:15 a.m. MISSION DURATION: 10 days, 21 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 230 statute miles/28.45 degrees NOTE: The right-hand orbital maneuvering system pod is being connected to the orbiter today. In the VAB, preparations are in work to mate the external tank with the solid rocket boosters tomorrow. KEY OPERATIONAL MILESTONES (dates are target only): · Mate external tank with solid rocket boosters in the VAB (May 31) · Crew equipment interface test (June 2) · Begin installing space shuttle main engines (June 6) · Roll orbiter to Vehicle Assembly Building (June 20) MISSION: STS-73 -- U.S. MICROGRAVITY LABORATORY-2 VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH DATE/TIME: Sept. 21 at 10:37 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: Oct. 7 at 8:31 a.m. MISSION DURATION: 16 days CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 172 statute miles/39 degrees NOTE: Today, fuel cells no. 2 and 3 are being prepared for installation into the orbiter.

      GO TO THE STATUS REPORTS HOME PAGE