      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT WEDNESDAY, NOV. 22, 1995
      * No work is planned on any of the Space Shuttles over the four-day Thanksgiving Day holiday weekend. Normal work will resume on Nov. 27.
      MISSION: STS-72 -- SFU-Retrieval & OAST-Flyer VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility Bay 3 TARGET LAUNCH DATE/TIME: Jan. 11 at 4:18 a.m. EST LAUNCH WINDOW: 60 minutes TARGET KSC LANDING DATE/TIME: Jan. 20 at 2:54 a.m. MISSION DURATION: 8 days, 22 hours, 36 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 288 statute miles/28.45 degrees WORK COMPLETED: * Final payload bay door closure for flight KEY STS-72 OPERATIONAL MILESTONES (dates are target only): * Roll to Vehicle Assembly Building (Nov. 29) * Rollout to pad 39B (Dec. 5) * Terminal Countdown Demonstration Test (Dec. 11-12) * Flight Readiness Review (Jan. 4) MISSION: STS-75 -- TETHERED SATELLITE-1R & USMP-3 VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility Bay 2 TARGET LAUNCH DATE: Feb. 22, 1996 TARGET KSC LANDING DATE: March 7, 1996 MISSION DURATION: 13 days, 16 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees WORK COMPLETED: * Removed three main engines for refurbishment in the VAB Main Engine Shop KEY STS-75 OPERATIONAL MILESTONES (dates are target only): * Functional checks of the forward reaction control system (Nov. 27) * Begin removal of onboard cryogenic storage tank set no. 2 (Nov. 28) MISSION: STS-76 -- 3rd MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: OPF Bay 1 TARGET LAUNCH DATE: Mar. 21, 1996 KSC LANDING DATE: Mar. 30, 1996 MISSION DURATION: 10 days CREW SIZE: 6 up; 5 down ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees WORK IN PROGRESS: * Post flight inspections * Destowing STS-74 mission specific items * Preparations for trickle purge of the orbital maneuvering system WORK COMPLETED: * Drying of the main engine high pressure fuel pumps * Offloaded residual reactants from the power reactant storage and distribution system
      * The next status report will be issued Nov. 27.
      All times eastern

      GO TO THE STATUS REPORTS HOME PAGE