GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      

      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT


      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT TUESDAY, OCTOBER 31, 1995 (10:35 AM EST) Flight Day 12 MISSION: STS-73 -- U.S. MICROGRAVITY LABORATORY-2 VEHICLE: Columbia/OV-102 LOCATION: Orbit OFFICIAL LAUNCH DATE/TIME: Oct. 20 at 9:53 a.m. (EDT) TARGET KSC LANDING DATE/ *TIME: Nov. 5 at 6:54 a.m. (EST) *MISSION DURATION: 15 days, 22 hours, 1 minute CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 172 statute miles/39 degrees * change from earlier status NOTE: Mission status reports are issued daily from the Johnson Space Center and payload status reports are issued from the Marshall Space Flight Center. The STS-73 crew are: Commander Ken Bowersox; Pilot Kent Rominger; Mission Specialists Catherine Coleman, Michael Lopez-Alegria and Kathryn Thornton; and Payload Specialists Fred Leslie and Albert Sacco. MISSION: STS-74 -- 2nd MIR DOCKING (Docking Module) VEHICLE: Atlantis/OV-104 LOCATION: Pad 39A TARGET LAUNCH DATE/TIME: Nov. 11 at 7:56 a.m. LAUNCH WINDOW: 6 minutes, 57 seconds TARGET MIR DOCKING DATE/TIME: Nov. 14 at about 2:20 a.m. TARGET KSC LANDING DATE/TIME: Nov. 19 at about 1:28 p.m. MISSION DURATION: 8 days, 5 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees NOTE: Repairs to the tiles damaged on the rudder speed brake have been finished. Work to check the turbo pump discharge temperature sensors is in work today and is expected to be finished by tomorrow morning with no impact to the overall schedule. IN WORK TODAY: * Aft engine compartment close-outs * Check-out contingency space suits * Check turbo pump discharge temperature sensors on main engines WORK COMPLETED: * Install contingency space suits * Repair rudder speed brake tiles KEY STS-74 OPERATIONAL MILESTONES (dates are target only): * Close payload bay doors for flight (Nov. 2) * Ordnance installation and pressurize hypergolic system (Nov. 3) * Launch countdown begins (7 a.m. Nov. 8) MISSION: STS-72 -- SFU-Retrieval & OAST-Flyer VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility Bay 3 TARGET LAUNCH DATE/TIME: Jan. 11 at 4:18 a.m. EST LAUNCH WINDOW: 60 minutes TARGET KSC LANDING DATE/TIME: Jan. 20 at 2:54 a.m. MISSION DURATION: 8 days, 22 hours, 36 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees KEY STS-72 OPERATIONAL MILESTONES (dates are target only): * Install OAST-Flyer payload into payload bay (Nov. 3) * Mate external tank with solid rocket boosters in Vehicle Assembly Building (Nov. 9) * Final payload bay door closure (Nov. 21) * Roll to Vehicle Assembly Building (Nov. 29) All times eastern

      GO TO THE STATUS REPORTS HOME PAGE