KSC SPACE SHUTTLE STATUS REPORT Monday, Sept. 11, 1995 Vehicle: OV-102/Columbia Mission number: STS-73 Location: Pad 39-B Primary payload: USML-2 Astronauts: 7 Orbital altitude: 172 statute miles Inclination: 39 degrees Mission Duration: 15 days, 22 hours Launch date: Sept. 28 9:35 a.m. EDT Landing date: Oct. 14 7:29 a.m. EDT STS-73 IN WORK TODAY: · Terminal Countdown Demonstration Test (TCDT) · Helium signature leak test · KSC Launch Readiness Review (LRR) · Preparations for storable propellant loading operations STS-73 WORK SCHEDULED: · TCDT conclusion (Tuesday 11 a.m.) · Hypergolic propellant loading activities (Wednesday-Thursday) · Auxiliary power unit hot fire (Friday) · USML battery charging and experiment fit checks (next week) STS-73 WORK COMPLETED: · solid rocket booster nozzle repair and confidence work Issues and Concerns: None at this time. Atlantis/OV-104 (STS-74) Russian MIR-2 Docking Module OPF Bay 2 Today the Russian MIR-2 Docking Module is being transported from the Operations and Checkout Building to OPF Bay 2 and will be installed into the payload bay of Atlantis late this afternoon. The Interface Verification Test (IVT) to verify the mechanical and electrical connections is scheduled for Monday and Tuesday next week. The orbiter docking system (ODS) was installed into the payload bay over the weekend and electrical connections are being made today. The heat shields are being installed around the three main engines. In the Vehicle Assembly Building, the external tank is being mated to the solid rocket boosters today. For schedule reasons, a decision has been made to repair the STS-74 solid rocket booster nozzles in the VAB instead of at the launch pad. Discovery/OV-103 OPF Bay 1 Work continues to deconfigure and deservice Discovery in preparation for the ferry flight to Palmdale. Discovery will be towed to the Shuttle Landing Facility on Sept. 25 for mating to the 747 Shuttle Carrier Aircraft. The ferry flight is scheduled to begin on Sept. 26. STS-69 Hangar AF At NASA Hangar AF on Cape Canaveral Air Station, removal of the solid rocket booster nozzles will be completed today. They will be shipped to Thiokol in Utah on Tuesday to begin inspections of the nozzle joint O-ring seals. The disassembly and analysis will take approximately two weeks. KSC 24-Hour Weather Summary Shuttle Landing Facility Today’s minimum temperature: 71 degrees Yesterday’s maximum temperature: 86 degrees Lowest relative humidity: 72 percent Peak wind speed/direction: 18 mph/E Precipitation as of 7 a.m.: Trace Total monthly precipitation: 2.42 inches Barometric pressure at 7 a.m.: 30.05