      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT THURSDAY, SEPTEMBER 21, 1995 (12:48 PM EDT) MISSION: STS-73 -- U.S. MICROGRAVITY LABORATORY-2 VEHICLE: Columbia/OV-102 LOCATION: Pad 39B TARGET LAUNCH DATE/TIME: Sept. 28 at 9:35 a.m. EDT LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: Oct. 14 at 7:30 a.m. MISSION DURATION: 15 days, 21 hours, 55 minutes CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 172 statute miles/39 degrees IN WORK TODAY: * Aft engine compartment close-outs * Functional check-out of contingency spacesuits * Countdown preparations WORK COMPLETED: * Ordnance operations and hypergolic fuel pressurization * External tank and solid rocket boosters close-outs KEY OPERATIONAL MILESTONES: * Begin countdown (4 a.m. Monday) * STS-73 crew arrival at KSC (8 a.m. Monday) * Spacelab final stowage operations (Tuesday) * Begin cryogenic loading of external tank for flight (1:15 a.m. Thursday) MISSION: STS-74 -- 2nd MIR DOCKING (Docking Module) VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE/TIME: Nov. 2 at 11:25 a.m. EST LAUNCH WINDOW: 9 minutes, 14 seconds TARGET MIR DOCKING DATE: Nov. 5 TARGET KSC LANDING DATE/TIME: Nov. 10 at 8:30 a.m. MISSION DURATION: 7 days, 21 hours CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees KEY OPERATIONAL MILESTONES (dates are target only): * Docking module interface verification test (Wednesday/Thursday) * Final payload bay door closure (Sept. 26) * Roll to Vehicle Assembly Building (Oct. 2) * Move to Pad 39A (Oct. 9) MISSION: STS-72 -- SFU-Retrieval & OAST-Flyer VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 3 TARGET LAUNCH DATE/TIME: Jan. 11 at 5:04 a.m. EST LAUNCH WINDOW: 38 minutes TARGET KSC LANDING DATE/TIME: Jan. 20 at 3:14 a.m. MISSION DURATION: 8 days, 22 hours, 11 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 184 statute miles/28.45 degrees NOTE: Post-mission servicing of Endeavour continues in OPF bay 3. The payload bay doors will be open today and the payloads removed on Saturday. DISCOVERY/OV-103 -- Pre-Orbiter Maintenance Down Period VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 1 DATE OF DEPARTURE FOR PALMDALE, CALIF.: Sept. 26 NOTE: Discovery is scheduled to be delivered to Palmdale, Calif., for a nine-month Orbiter Maintenance Down Period (OMDP). During this time, the vehicle will be outfitted with a 5th set of cryogenic tanks and an external airlock to support missions to the international Space Station. Discovery is scheduled to depart KSC via the 747 Shuttle Carrier Aircraft (SCA) at 7 a.m. Tuesday, Sept. 26. Discovery’s next flight, the second mission to service the Hubble Space Telescope, is targeted for launch in early 1997. KEY OPERATIONAL MILESTONES: * Install protective tail cone (continues in work today) * Place orbiter on transporter and retract landing gear (Friday) * Move orbiter to Shuttle Landing Facility for mate with 747 SCA (5:30 a.m. Monday) * Depart Shuttle Landing Facility on SCA (7 a.m. Tuesday)

      GO TO THE STATUS REPORTS HOME PAGE