GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORTGO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT MONDAY, AUGUST 26, 1996 (12:02 PM EDT) KSC Public Affairs Contact: Bruce Buckingham (fax 407-867-2692) E-mail: Bruce.Buckingham-1@kmail.ksc.nasa.gov MISSION: STS-79 -- 4th MIR DOCKING & SPACEHAB DM (image) VEHICLE: Atlantis/OV-104 (image) LOCATION: Pad 39A TARGET LAUNCH DATE/TIME: (no earlier than) Sept. 12 at about 6:26 a.m. (EDT) LAUNCH WINDOW: 7-10 minutes TARGET KSC LANDING DATE/TIME: Sept. 21 at about 11:30 a.m. MISSION DURATION: 9 days, 5 hours CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees NOTE: The crew of mission STS-79 arrived at KSC yesterday (image) for the scheduled Terminal Countdown Demonstration Test to be held Tuesday and Wednesday. At about 8:45 a.m. tomorrow, the crew will hold an informal press conference at the pad. Work at the pad today includes preparations to load hypergolic propellants aboard Atlantis and the completion of the Spacehab interface verification test. (image) Also, the Launch Readiness Review will take place at KSC this afternoon. KEY STS-79 OPERATIONAL MILESTONES (dates are target only): STS-79 Terminal Countdown Demonstration Test (Tuesday-Wednesday) Hypergolic propellant loading (Wednesday) Flight Readiness Review (Thursday) MISSION: STS-80 -- WAKE SHIELD FACILITY-3 and ORFEUS-SPAS-2 (image) VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE/TIME: (no earlier than) Oct. 31 at 2:40 p.m. (EST) LAUNCH WINDOW: 2 hours, 20 minutes TARGET KSC LANDING DATE/TIME: (no earlier than) Nov. 16 at 7:25 a.m. MISSION DURATION: 16 days CREW SIZE: 5 ORBITAL ALTITUDE and INCLINATION: 218 statute miles/28.45 degrees NOTE: Checks of the Freon coolant loops are complete and good. Main engine securing and a functional check of the right hand orbital maneuvering system pod are in work today. KEY STS-80 OPERATIONAL MILESTONES (dates are target only): Begin stacking solid rocket boosters in VAB (Thursday) Crew equipment interface test (Sept. 13-14) Final payload bay door closure (Sept. 23) Roll to Vehicle Assembly Building (Sept. 30) NOTE: MISSION STS-81, ATLANTIS, IS NOW TARGETED FOR LAUNCH ABOUT JAN. 12, 1997. SHUTTLE PROCESSING STATUS WILL BE ISSUED FOLLOWING MISSION STS-79. MISSION: STS-82 -- HUBBLE SPACE TELESCOPE SERVICING MISSION-2 VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE: February 13, 1997 LAUNCH WINDOW: 61 minutes TARGET KSC LANDING DATE: February 23, 1997 MISSION DURATION: 9 days, 22 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 360 statute miles/28.45 degrees NOTE: The star tracker is being installed today as the payload bay undergoes configuring for launch. KEY OPERATIONAL MILESTONES (dates are target only): Install and checkout drag chute (image) (Sept. 4-5) Deliver forward reaction control system to OPF (Sept. 16) Complete installation of the forward reaction control system (Sept. 18)-- end -- For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."