
GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORTGO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT TUESDAY, JULY 2, 1996 (11:54 AM EDT) KSC Public Affairs Contact: Bruce Buckingham (fax 407-867-2692) E-mail: Bruce.Buckingham-1@kmail.ksc.nasa.gov MISSION: STS-78 -- LIFE AND MICROGRAVITY SPACELAB (LMS) Flight Day 13 VEHICLE: Columbia/OV-102 LOCATION: Orbit OFFICIAL LAUNCH DATE/TIME: June 20 at 10:49 a.m. (EDT) TARGET KSC LANDING DATE/TIME: July 7 at about 8:38 a.m. MISSION DURATION: 16 days, 21 hours, 49 minutes CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 173 statute miles/39 degrees NOTE: Mission managers have officially approved the extension day for mission STS-78 and targeted Columbia's KSC landing at about 8:38 a.m. on July 7. A landing at this time will break by about seven hours the Shuttle mission duration record currently held by Endeavour on mission STS-67 last year. Johnson Space Center Mission Status Reports are now available automatically by sending an Internet electronic mail message to jscnews-request@listserver.jsc.nasa.gov. In the body of the message (not the subject line) users should type "subscribe" (no quotes). This will add the e-mail address that sent the subscribe message to the news release distribution list. The system will reply with a confirmation via e-mail of each subscription. Once you have subscribed you will receive future news releases via e-mail. MISSION: STS-79 -- 4th MIR DOCKING & SPACEHAB DM VEHICLE: Atlantis/OV-104 LOCATION: Pad 39A TARGET LAUNCH DATE/TIME: July 31 at about 11:29 p.m. (EDT) LAUNCH WINDOW: 7-10 minutes TARGET KSC LANDING DATE/TIME: August 9 at about 8:05 p.m. MISSION DURATION: 8 days, 20 hours, 35 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees NOTE: A hot fire of the no. 3 auxiliary power unit was successfully conducted yesterday afternoon and the protective Rotating Service Structure has now been moved into position around the vehicle. Today, work includes launch pad validations and the main engine flight readiness test. KEY STS-79 OPERATIONAL MILESTONES (dates are target only): Helium signature leak checks (July 8) Install Spacehab Double Module into orbiter (July 9) STS-79 Terminal Countdown Demonstration Test (July 18-19) Close payload bay doors for flight (July 18) MISSION: STS-82 -- HUBBLE SPACE TELESCOPE SERVICING MISSION - 2 VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE: February 13, 1997 LAUNCH WINDOW: 61 minutes TARGET KSC LANDING DATE: February 23, 1997 MISSION DURATION: 9 days, 22 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 360 statute miles/28.45 degrees NOTE: Preparations have begun to remove the ferry flight equipment from Discovery. The tail cone will be removed next week. Access to aft, mid-body and crew module is continuing today. KEY OPERATIONAL MILESTONES (dates are target only): Initial power-up (July 9) Remove tail cone (July 9) Open payload bay door (July 16) PREPARATIONS FOR ORBITER MAINTENANCE DOWN PERIOD VEHICLE: Endeavour/OV-105 LOCATION: Orbiter Processing Facility bay 3 NOTE: The right hand orbital maneuvering system pod has been removed as preparations continue to prepare Endeavour for its first Orbiter Maintenance Down Period (OMDP). Endeavour's OMDP involves sending the orbiter to Palmdale, CA, for about eight months of major modifications and structural inspections. Delivery to Palmdale will occur around the first of August. Once Endeavour returns to KSC, its next mission will be the first International Space Station assembly Space Shuttle flight, scheduled for launch from KSC in late 1997. KEY PRE-OMDP OPERATIONAL MILESTONES (dates are target only): Final payload bay closing (July 12) Rollout for ferry flight to Palmdale, CA (July 29)-- end -- For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to: domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status" or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status" or "unsubscribe ksc-press-release."