
GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
GO TO THE NEXT SPACE SHUTTLE STATUS REPORT
KENNEDY SPACE CENTERSPACE SHUTTLE STATUS REPORT WEDNESDAY, MAY 1, 1996 (10:20 AM EDT) KSC Public Affairs Contact: Bruce Buckingham (fax 407-867-2692) E-mail: Bruce.Buckingham-1@kmail.ksc.nasa.gov MISSION: STS-77 -- SPACEHAB-4 & SPARTAN 207 VEHICLE: Endeavour/OV-105 LOCATION: Pad 39B TARGET LAUNCH DATE/TIME: May 16 at 6:32 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: May 26 at 7:09 a.m. MISSION DURATION: 10 days CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 176 statute miles/39 degrees NOTE: The pad is open today following hypergolic reactant loading into the orbiter’s reaction control system storage tanks. Operations are now underway to complete the payload interface verification tests. KEY STS-77 OPERATIONAL MILESTONES (dates are target only): * TEAMS payload interface verification test (today) * Spartan payload interface verification test (Thursday) * Close payload bay doors for flight (Friday) * Launch Readiness Review (Friday) * Begin orbiter aft engine compartment close-outs (May 6) * Flight Readiness Review (May 7) * Ordnance installation and hypergolic pressurization (May 7) * Begin launch countdown (May 13) MISSION: STS-78 -- LIFE AND MICROGRAVITY SPACELAB (LMS) VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE/TIME: June 20 at about 10:49 a.m. LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: July 6 at about 8:46 a.m. MISSION DURATION: 15 days, 22 hours CREW SIZE: 7 ORBITAL ALTITUDE and INCLINATION: 173 statute miles/39 degrees NOTE: The tunnel adapter was installed yesterday and the payload interface verification test is complete and good. The external tank will be mated with the boosters later this week in the Vehicle Assembly Building. KEY STS-78 OPERATIONAL MILESTONES (dates are target only): * Mate external tank with solid rocket boosters (Friday) * Final aerosurface checks and flight readiness test (Friday) * Roll orbiter to Vehicle Assembly Building (May 23) MISSION: STS-79 -- 4th MIR DOCKING VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE: July 31 at about 11:42 p.m. LAUNCH WINDOW: 7-10 minutes TARGET KSC LANDING DATE: August 9 at about 8:17 p.m. MISSION DURATION: 8 days, 20 hours, 35 minutes CREW SIZE: 6 ORBITAL ALTITUDE and INCLINATION: 196-245 statute miles/51.6 degrees NOTE: Testing of the orbiter’s main propulsion system continues this week. A functional check of the orbital maneuvering system pods is scheduled for tomorrow. Checks of the Ku-band system are underway today. KEY STS-79 OPERATIONAL MILESTONES (dates are target only): * Orbital maneuvering system functional checks (Thursday) * Install Space Shuttle main engines (May 20)
GO TO THE STATUS REPORTS HOME PAGE