GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      

      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT


      KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT THURSDAY, OCTOBER 3, 1996 (1:16 PM EDT) KSC Public Affairs Contact: Bruce Buckingham (fax 407-867-2692) E-mail: Bruce.Buckingham-1@kmail.ksc.nasa.gov MISSION: STS-80 -- WAKE SHIELD FACILITY-3 and ORFEUS-SPAS-2 (image) VEHICLE: Columbia/OV-102 LOCATION: Orbiter Processing Facility bay 1 TARGET LAUNCH DATE/TIME: Nov. 8 at 2:47 p.m. (EST) LAUNCH WINDOW: 2 hours, 30 minutes TARGET KSC LANDING DATE/TIME: Nov. 24 at 7:31 a.m. MISSION DURATION: 16 days CREW: Cockrell, Rominger, Jernigan, Jones, Musgrave ORBITAL ALTITUDE and INCLINATION: 219 statute miles/28.45 degrees NOTE: Close-outs of the orbiter's aft main engine compartment continue with leak checks scheduled for today. Orbiter weight and center of gravity checks are set for tomorrow. The orbiter is scheduled to be placed on the orbiter transporter tomorrow as preparations continue for roll-over to the VAB next week. First motion is set for 10 a.m. Monday. KEY STS-80 OPERATIONAL MILESTONES (dates are target only): Roll Columbia to Vehicle Assembly Building and mate with external tank (Monday) Deliver payload to Pad 39B (Oct. 10) Roll-out to Pad 39B (Oct. 14) Terminal Countdown Demonstration Test (Oct. 17-18) MISSION: STS-81 -- 5th MIR DOCKING & SPACEHAB DM (image) VEHICLE: Atlantis/OV-104 LOCATION: Orbiter Processing Facility bay 3 TARGET KSC LAUNCH DATE/TIME: Jan. 12, 1997 at about 4:17 a.m. (EST) LAUNCH WINDOW: 7-10 minutes TARGET KSC LANDING DATE/TIME: Jan. 21, 1997 at about 8:40 a.m. MISSION DURATION: 9 days (+1) CREW: Baker, Jett, Grunsfeld, Ivins, Wisoff, Linenger (up) Blaha (down) ORBITAL ALTITUDE and INCLINATION: 184 statute miles/51.6 degrees NOTE: Work today includes preparations for deservicing the auxiliary power units. APU no. 2 and its controller will be removed early next week and sent to the vendor for analysis. The other two APUs will be removed later in the week. Also, window no. 8 is being removed and replaced beginning today. SRB stacking continues in the VAB. KEY STS-81 OPERATIONAL MILESTONES (dates are target only): Remove Space Shuttle main engines (Oct. 24) Install Space Shuttle main engines (Nov. 5) MISSION: STS-82 -- HUBBLE SPACE TELESCOPE SERVICING MISSION-2 VEHICLE: Discovery/OV-103 LOCATION: Orbiter Processing Facility bay 2 TARGET LAUNCH DATE/TIME: February 13, 1997 at 2:59 a.m. LAUNCH WINDOW: 61 minutes TARGET KSC LANDING DATE/TIME: February 23, 1997 at 1:35 a.m. MISSION DURATION: 9 days, 22 hours CREW: Bowersox, Horowitz, Lee, Hawley, Harbaugh, Smith, Tanner ORBITAL ALTITUDE and INCLINATION: 360 statute miles/28.45 degrees NOTE: Mid-body close-outs and water coolant loop servicing continue today. Interface verification tests for the forward reaction control system is set for Friday. KEY OPERATIONAL MILESTONES (dates are target only): Install Space Shuttle main engines (Oct. 14) Install left-hand orbital maneuvering system pod (Oct. 21)
      --end--
      For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release." Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      GO TO THE STATUS REPORTS HOME PAGE