
STS-85 -- CRISTA-SPAS-2 (image)
NOTE: After a day of orbiter rotation maneuvers, Discovery continues to provide a stable platform for science investigations on mission STS-85. The Space Shuttle is in excellent condition and mission managers are not working any significant problems.
At Hangar AF, the solid rocket motor nozzles are being removed from the boosters today for shipment to Utah. The nozzles will arrive in Utah early next week for inspection.
STS-85 crew members: Commander Curtis Brown, Pilot Kent Rominger, Mission Specialists Jan Davis, Robert Curbeam and Stephen Robinson; and Payload Specialist Bjarni Tryggvason
STS-86 -- 7th MIR DOCKING & SPACEHAB DM
NOTE: In the Vehicle Assembly Building, the Shuttle Interface Test is under way and continues through Friday. Atlantis will roll out to Pad 39A at 2 a.m. Monday, Aug. 18 and should be hard down at 8 a.m. The Spacehab payload is scheduled to arrive at the launch pad on Aug. 28.
STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-87 -- U.S. MICROGRAVITY PAYLOAD-4NOTE: Functional testing of the Shuttle's aft and main propulsion systems continue. Saturday, technicians will remove Columbia's oxidizer cross-feed line from the orbiter maneuvering system to isolate the line and complete draining activities. Once the line is clear, leak checks and repair work will follow next week.
STS-87 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-89 -- 8th MIR DOCKING & SPACEHAB DM
NOTE: Testing of Endeavour's Ku-band system is in work. Helium leak checks on the orbiter's main propulsion system are in work and auxiliary power unit installation continues. Modifications of the left and right-hand elevon coves conclude next week.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/