KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      WEDNESDAY, AUGUST 27, 1997 (3:21 PM EDT)

      KSC Public Affairs Contact: Joel Wells (fax 407-867-2692)
      E-mail: Joel.Wells-1@ksc.nasa.gov

      MISSION: STS-86 -- 7th MIR DOCKING & SPACEHAB DM

      STS-86 images

      • VEHICLE: Atlantis/OV-104
      • LOCATION: Pad 39A
      • TARGET KSC LAUNCH DATE/TIME: Sept. 25 at about 10:34 p.m.
      • LAUNCH WINDOW: 7-10 minutes
      • MIR DOCKING TIME: Sept. 27 at 5:30 p.m. EDT
      • UNDOCKING TIME: Oct. 3 at 11:46 a.m. EDT
      • TARGET KSC LANDING DATE/TIME: Oct. 5 at 6:56 p.m.
      • MISSION DURATION: 9 days, 20 hours, 19 minutes
      • CREW: Wetherbee, Bloomfield, Parazynski, Titov, Chretien, Lawrence, Wolf (up), Foale (down)
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees

      NOTE: Loading of hypergolic fuels into Atlantis' power reactant storage and distribution system began last night and will conclude tomorrow. In the Shuttle's aft compartment, the pyrotechnic canister assemblies will be installed at the external tank/orbiter attach points later this week. The Shuttle's payload bay doors will be opened on Sept. 5 to support vertical payload installation. The Spacehab payload is now slated for delivery to Pad 39A on Sept. 4.

      STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Spacehab payload transfer to Pad 39A (Sept. 4)
      • Terminal Countdown Demonstration Test (Sept. 9-10)
      • STS-86 Flight Readiness Review (Sept. 12)

      MISSION: STS-87 -- U.S. MICROGRAVITY PAYLOAD-4
      • VEHICLE: Columbia/OV-102
      • LOCATION: Orbiter Processing Facility bay 2
      • TARGET KSC LAUNCH DATE/TIME: Nov. 19 at 2:18 p.m.
      • LAUNCH WINDOW: 2 hours, 30 minutes
      • TARGET KSC LANDING DATE/TIME: Dec. 5 at 6:51 a.m.
      • MISSION DURATION: 15 days, 16 hours, 33 minutes
      • CREW: Kregel, Lindsey, Scott, Chawla, Doi, Kadenyuk
      • ORBITAL ALTITUDE and INCLINATION: 150 nautical miles/28.45 degrees

      NOTE: Leak checks on Columbia's oxidizer cross-feed line are complete and good. Leak checks on the main propulsion system will conclude tonight and inspections of the sector seals on the rudder speed brake are underway. Installation of the remote manipulator system is in work today and weight saving modifications to the orbiter's elevons continue.

      STS-87 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Helium system leak and functional testing (Aug. 28 and 29)
      • Shuttle main engine installation begins (Sept. 6)

      MISSION: STS-89 -- 8th MIR DOCKING & SPACEHAB DM

      STS-89 images

      • VEHICLE: Endeavour/OV-105
      • LOCATION: Orbiter Processing Facility bay 1
      • TARGET KSC LAUNCH DATE/TIME: Jan. 15, 1998 at about 1:03 a.m.
      • LAUNCH WINDOW: 7-10 minutes
      • TARGET KSC LANDING DATE/TIME: Jan. 24, 1998 at about 4:47 a.m.
      • MISSION DURATION: 9 days, 3 hours, 44 minutes
      • CREW: Wilcutt, Edwards, Dunbar, Anderson, Reilly, Wolf (down)
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees

      NOTE: Gaseous nitrogen purging of the ammonia boiler is complete and servicing begins on Friday. Leak checks are in work on Endeavour's auxiliary power units No. 2 and No. 3. Preparations continue for installation of fuel cell No. 2 on Thursday. Modifications of the orbiter's left and right elevon coves continue through next week and body flap repair work concludes Thursday.


      MISSION: STS-91 -- 9th MIR DOCKING & SPACEHAB DM
      • VEHICLE: Discovery/OV-103
      • LOCATION: OPF Bay 3
      • TARGET KSC LAUNCH DATE/TIME: May 28 at 8:33 p.m.
      • LAUNCH WINDOW: 7-10 minutes
      • TARGET KSC LANDING DATE/TIME: June 7 at 12:17 a.m.
      • MISSION DURATION: 9 days, 3 hours, 44 minutes
      • CREW: TBD
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees

      NOTE: Removal of the CRISTA-SPAS payload from Discovery's payload was completed yesterday. Deservicing of the Shuttle's orbiter maneuvering system begins Thursday. Post-flight window inspections reveal a potential need to replace window No. 5.

      --end--

      For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/