KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      MONDAY, JULY 14, 1997 (12:51 PM EDT)

      KSC Public Affairs Contact: Joel Wells (fax 407-867-2692)
      E-mail: Joel.Wells-1@kmail.ksc.nasa.gov

      MISSION: STS-94 -- Microgravity Science Laboratory-1 (image)
      Flight Day 14

      Take a Virtual Tour of Columbia and the Microgravity Science Laboratory-1 Payload!

      Index of STS-83/STS-94 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: on orbit
      • OFFICIAL LAUNCH DATE/TIME: July 1 at 2:02 p.m. EDT (image)
      • TARGET KSC LANDING DATE/TIME: July 17 at about 6:53 a.m. EDT
      • MISSION DURATION: 15 days, 16 hours, 51 minutes
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/28.45 degrees

      NOTE: Columbia continues to orbit the earth at an altitude of 160 nautical miles and all orbiter systems are in excellent condition. On orbit science investigations continue to focus on the Microgravity Science Laboratory.

      The crew of Mission STS-94: Commander Jim Halsell; Pilot Susan Still; Mission Specialists Janice Voss, Michael Gernhardt and Donald Thomas; and Payload Specialists Roger Crouch and Greg Linteris.


      MISSION: STS-85 -- CRISTA-SPAS-2 (image)

      Index of STS-85 images

      • VEHICLE: Discovery/OV-103
      • LOCATION: Pad 39A
      • TARGET KSC LAUNCH DATE/TIME: August 7 at 10:41 a.m. (under review)
      • LAUNCH WINDOW: 1 hour, 41 minutes
      • TARGET KSC LANDING DATE/TIME: August 18 at 7:29 a.m.
      • MISSION DURATION: 10 days, 20 hours, 48 minutes
      • CREW: Brown, Rominger, Davis, Curbeam, Robinson, Tryggvason
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/57 degrees

      NOTE: Discovery and the booster/external tank complement arrived at pad 39A at about 8 a.m. today. They began the 3.4-mile trek from the VAB, atop the crawler transporter at about 2 a.m. Pad validation is in work through tomorrow.

      At pad 39A (image), the CRISTA-SPAS payload will be installed into the cargo bay tomorrow morning.

      STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Vertical payload installation into orbiter (July 15)
      • Terminal Countdown Demonstration Test (July 22-23)
      • Flight Readiness Review (July 24)

      MISSION: STS-86 -- 7th MIR DOCKING & SPACEHAB DM

      • VEHICLE: Atlantis/OV-104
      • LOCATION: Orbiter Processing Facility bay 3
      • TARGET KSC LAUNCH DATE/TIME: September 18 at about 1:39 a.m.
      • LAUNCH WINDOW: 7-10 minutes
      • TARGET KSC LANDING DATE/TIME: September 28 at about 5:19 a.m.
      • MISSION DURATION: 10 days, 3 hours, 49 minutes
      • CREW: Wetherbee, Bloomfield, Parazynski, Titov, Chretien, Lawrence (up), Foale (down)
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees

      NOTE: Shuttle main engine heat shield installation is complete. Preparations are in work for tomorrow's integrated hydraulic test. The payload bay doors are slated for closure later this week. In the VAB, solid rocket booster stacking operations are on schedule for external tank/SRB mate activities on Friday.

      A routine, 3-week Modal (structural) Test concludes on the vehicle July 21. Because the test requires the orbiter's midbody to be closed for flight, the midbody portion of the Crew Equipment Interface Test (CEIT) will occur tonight. The forward portion of the CEIT is scheduled for July 26.

      STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Payload bay doors closed for flight (July 19)
      • Orbiter Modal Test complete (July 21)
      • External tank and solid rocket booster mate (July 24)

      MISSION: STS-89 -- 8th MIR DOCKING & SPACEHAB DM
      • VEHICLE: Endeavour/OV-105
      • LOCATION: Orbiter Processing Facility bay 1
      • TARGET KSC LAUNCH DATE/TIME: January 15, 1998 at about 12:57 a.m.
      • LAUNCH WINDOW: 7-10 minutes
      • TARGET KSC LANDING DATE/TIME: January 24, 1998 at about 5:20 a.m.
      • MISSION DURATION: 9 days, 4 hours, 23 minutes
      • CREW: Wilcutt, Edwards, Dunbar, Anderson, Reilly, Wolf (up), Lawrence (down)
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees

      NOTE: Modifications to the orbiter's elevon coves are back in work through next week. Functional testing of the atmospheric revitalization pressure control system is scheduled through Wednesday and removal of the liquid oxygen 17-inch disconnect continues. Orbiter docking mechanism installation is underway.

      --end--

      For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/


      Go to the Previous Space Shuttle Status Report
      Go to the Next Space Shuttle Status Report

      Go to the Status Reports Home Page