STS-94 -- Microgravity Science Laboratory-1 (image)Take a of Columbia and the Microgravity Science Laboratory-1 Payload!
NOTE: Mission managers are targeting Thursday for Columbia's return home and are evaluating weather conditions at KSC and Edwards Air Force Base. KSC has two landing opportunities on Thursday - one at 6:47 a.m. and another at 8:23 a.m. Though Edwards Air Force Base will not be called on to support a Thursday landing, Edwards does provide a single opportunity on Friday at 9:45 a.m EDT. KSC's Friday opportunities are at 6:45 a.m. and 8:20 a.m.
Forecasters expect high pressure to dominate Florida's weather on Thursday. For the first KSC opportunity, light and variable surface winds and moisture will cause fog patches to develop near sunrise. The second KSC opportunity is expected to provide better weather conditions.
Clouds: Few at 2,000 feet and scattered at 25,000 feet Visibility: 7 miles with a chance for 1/2 mile if fog is predominate Wind: West at 4 knots Temperature: 73 degrees F Dewpoint: 73 Degrees Relative Humidity: 100% Precipitation: Showers offshore beyond 30 nautical miles
The crew of Mission STS-94: Commander Jim Halsell; Pilot Susan Still; Mission Specialists Janice Voss, Michael Gernhardt and Donald Thomas; and Payload Specialists Roger Crouch and Greg Linteris.
STS-85 -- CRISTA-SPAS-2 (image)
NOTE: At pad 39A, the Rotating Service Structure is in place around Discovery. Pad validation activities are underway and integrated hydraulic operations are slated for tomorrow. Preparations are in work for loading of hypergolic propellants, scheduled for July 24. The payload bay doors were opened last night and vertical payload installation is in work today. The payload Interface Verification Test is scheduled for Thursday.
STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-86 -- 7th MIR DOCKING & SPACEHAB DM
NOTE: Lubrication and stowing activities for the orbiter docking system are complete. The STS-86 flight crew completed their midbody Crew Equipment Interface Test last night and will return to KSC on July 26 for crew compartment familiarization. Integrated hydraulic testing is in work on Atlantis and window polishing continues through tomorrow. Installation of the newly fabricated thermal protection tiles for the forward reaction control system is underway and Atlantis' Modal (structural) Test will conclude this weekend.
The payload bay doors are slated for closure later this week. In the VAB, solid rocket booster stacking operations are on schedule for external tank/SRB mate activities on July 24.
STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-89 -- 8th MIR DOCKING & SPACEHAB DMNOTE: Modifications to the orbiter's elevon coves are back in work through next week. The ammonia system's leak and functional testing is complete. Removal of the liquid oxygen 17-inch disconnect continues through tomorrow. While installing Endeavour's docking mechanism yesterday, technicians noticed a damaged seal on the mechanism. A new seal is being installed today and the docking mechanism will be installed tomorrow.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/