NOTE: Loading of storable hypergolic propellants aboard Columbia began at about 3:45 a.m. today. Tile installation work on the forward reaction control system is complete, with all 36 tiles bonded to the vehicle. Bond verification checks will begin after the loading of hypergolic propellants. The STS-94 Flight Readiness Review is underway, and Shuttle managers are expected to announce the official launch date at the conclusion of the meeting.
STS-94 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-85 -- CRISTA-SPAS-2 (image)
NOTE: Integrated systems hydraulic testing is in work. Close-out work on Discovery's body flap continues through Friday. Preparations are in work for payload bay door closure scheduled to occur next week.
In the Vehicle Assembly Building, joint close-outs on the right-hand solid rocket booster continue. Mating of the external tank to the booster stack is scheduled for Friday morning.
STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-86 -- 7th MIR DOCKING & SPACEHAB DM
NOTE: Fuel cell voltage tests are complete. The orbital maneuvering system pod functional checks continue through Friday. Window No. 1 has been installed. Polishing of Atlantis' other windows will continue through Monday. Radiator functional testing begins today.
STS-89 -- 8th MIR DOCKING & SPACEHAB DMNOTE: Deservicing of freon coolant loop No. 2 continues through Friday with replacement of a flow transducer included in the work. Main propulsion system leak checks are complete, and engineering will evaluate a small leak from a 17-inch disconnect.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/