STS-84 -- 6th MIR DOCKING & SPACEHAB DM (image)NOTE: Main propulsion system purge activities are complete. Preparations are in work for ordinance installation tonight and countdown preparations are also underway. Close-out activities continue in Atlantis' aft compartment. At the pad yesterday, a work stand contacted a battery cable that provides power to an accelerometer on the right SRB. A technician noted electrical arcing between the platform and the cable. The cable has been changed out and work to replace the battery is scheduled for today. The payload interface verification test continues through tonight.
STS-84 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-94 -- Microgravity Science Laboratory-1 (image)NOTE: Due to extended work on Columbia's body flap, Space Shuttle main engine installation is now slated for Friday and Saturday. Fuel cell voltage tests are complete. Installation of auxiliary power unit No. 3 is in work and preparations are under way for installation of auxiliary power unit No. 2. The forward reaction control system is slated for installation this weekend. In the VAB, preparations are underway for next week's planned external tank/solid rocket booster mating activities. Spacelab reservicing is wrapping up today and experiment testing will begin tomorrow.
STS-94 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-85 -- CRISTA-SPAS-2NOTE: Cycling of Discovery's external tank doors is in progress today. Work continues on the orbiter's body flap and main engine installation begins early next week. Payload premate activities continue through tomorrow and midbody close-outs are in work.
STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- ISS-01-2AENDEAVOUR (OV-105) NOTE: Endeavour is located in Orbiter Processing Facility bay 3. Validation of the orbiter's electrical system is complete for this week, but will pickup again next week. Orbiter coolant loop servicing continues. Removal of the right hand orbiter maneuvering system simulator is in work through Wednesday.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/