STS-84 -- 6th MIR DOCKING & SPACEHAB DM (image)NOTE: Close-out activities continue in Atlantis' aft compartment. The engine compartment doors are scheduled for installation tomorrow. Hypergolic propellant pressurization is complete. Testing of the orbiter's global positioning and inertial navigation systems continues today. Payload vertical close-outs are in work and payload bay door closure is slated for about 8 p.m. tomorrow.
STS-84 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-94 -- Microgravity Science Laboratory-1 (image)NOTE: Work to install auxiliary power units No. 2 and No. 3 continues. The forward reaction control system arrived in the OPF last night and will be installed into the orbiter this weekend. Main engine installation is scheduled to begin Friday morning. The Spacelab interface verification test is in work and experiment health checks are scheduled through Friday night. In the VAB, preparations are underway for next week's planned external tank/solid rocket booster mating activities.
STS-94 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-85 -- CRISTA-SPAS-2NOTE: Preparations are in work for main engine installation on Monday. Payload premate activities continue. Engineering continues to analyze data on the bent bolts in the linkage of the power drive unit on the right hand external tank door.
STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- ISS-01-2AENDEAVOUR (OV-105) NOTE: Endeavour is located in Orbiter Processing Facility bay 3. The freon coolant loop over pressurization test is complete and good. Removal of the right hand orbiter maneuvering system simulator is complete. Orbiter maneuvering system/reaction control system wiring work is in progress.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/