KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      WEDNESDAY, MAY 21, 1997 (10:30 AM EDT)

      KSC Public Affairs Contact: Joel Wells (fax 407-867-2692)
      E-mail: J.Wells-1@ksc.nasa.gov

      MISSION: STS-84 -- 6th MIR DOCKING & SPACEHAB DM (image)
      FLIGHT DAY 7/8

      Index of STS-84 images

      • VEHICLE: Atlantis/OV-104
      • LOCATION: On orbit
      • OFFICIAL KSC LAUNCH DATE/TIME: May 15 at 4:07:48 a.m. EDT
      • OFFICIAL MIR DOCKING TIME: May 16 at 10:33 p.m.
      • UNDOCKING: May 21 at about 9:04 p.m.
      • TARGET KSC LANDING DATE/TIME: May 24 at 7:53 a.m.
      • MISSION DURATION: 9 days, 3 hours, 45 minutes
      • ORBITAL ALTITUDE and INCLINATION: 213 nautical miles/51.6 degrees

      NOTE: At Hangar AF, the nozzles from the STS-84 solid rocket boosters are being removed today. Shipment of the nozzles to Utah is scheduled for May 27.

      The Atlantis-Mir complex is in its fifth and final day of joint docking operations and the crews have successfully completed the transfer of all Mir resupply items. Atlantis will separate from the Russian space station at about 9:04 p.m. ending more than 120 hours of docked activities.

      The crew of STS-84 are: Commander Charles Precourt, Pilot Eileen Collins and Mission Specialists Jean-Francois Clervoy, Carlos Noriega, Edward Lu, Elena Kondakova, Michael Foale (up) and Jerry Linenger (down).


      MISSION: STS-94 -- Microgravity Science Laboratory-1 (image)

      Index of STS-83/STS-94 images

      • VEHICLE: Columbia/OV-102 (image)
      • LOCATION: Orbiter Processing Facility bay 1
      • TARGET KSC LAUNCH DATE/TIME: July 1 at 2:37 p.m.
      • LAUNCH WINDOW: 2 hours, 30 minutes
      • TARGET KSC LANDING DATE/TIME: July 17 at 7:23 a.m.
      • MISSION DURATION: 15 days, 16 hours, 46 minutes
      • CREW: Halsell, Still, Voss, Gernhardt, Thomas, Crouch and Linteris (image)
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/28.45 degrees

      NOTE: The heat shields have been installed on engines No. 2 and No. 3 and final heat shield installation is in work today. Work to connect auxiliary power unit fuel lines is complete. Cable and wiring work in the midbody is complete and close-outs are in work.

      The Spacelab transfer tunnel will be installed on Friday and payload technicians continue to troubleshoot a remote acquisition unit on Spacelab. The payload bay doors are now scheduled for closure on May 31.

      STS-94 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Spacelab transfer tunnel installation complete (May 23) (image)
      • Payload bay door closure (May 31)
      • Roll over to VAB for mate to external tank and boosters (June 4)

      MISSION: STS-85 -- CRISTA-SPAS-2 (image)

      Index of STS-85 images

      • VEHICLE: Discovery/OV-103
      • LOCATION: Orbiter Processing Facility bay 2
      • TARGET KSC LAUNCH DATE/TIME: August 7 at 10:39 a.m.
      • LAUNCH WINDOW: 1 hour, 41 minutes
      • TARGET KSC LANDING DATE/TIME: August 18 at 7:27 a.m.
      • MISSION DURATION: 10 days, 20 hours, 48 minutes
      • CREW: Brown, Rominger, Davis, Curbeam, Robinson, Tryggvason
      • ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/57 degrees

      NOTE: Main engine securing continues. Shuttle main engine and main propulsion system integrated testing continues. Interface verification testing for the horizontal payloads continues.

      STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Heat shield installation complete (May 29)
      • Integrated hydraulic/flight control operations (May 30)

      MISSION: STS-88 -- ISS-01-2A

      ENDEAVOUR (OV-105) NOTE: Endeavour is located in Orbiter Processing Facility bay 3. Preparations are underway to roll Endeavour to the Vehicle Assembly Building on Friday morning to make room in the OPF for Atlantis, once it lands at KSC on Saturday.

      --end--

      For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/


      GO TO THE PREVIOUS SPACE SHUTTLE STATUS REPORT
      GO TO THE NEXT SPACE SHUTTLE STATUS REPORT

      GO TO THE STATUS REPORTS HOME PAGE