STS-86 -- 7th MIR DOCKING & SPACEHAB DM
NOTE: At Hangar AF, solid rocket booster disassembly activities are underway and the nozzles will be shipped to Utah on Friday.
Atlantis' systems continue to operate very well on orbit with more than 80 percent of the Mir transfer activities complete.
STS-87 -- U.S. MICROGRAVITY PAYLOAD-4
NOTE: Heat shield installation is complete and aft compartment close-outs continue. Tests on the fuel cell monitoring system modifications continue in Columbia's midbody and fuel cell voltage tests are slated for early next week. Preparations continue for the payload premate test. With weight-saving modifications complete on Columbia's elevons, work continues on the flipper doors located above the elevon cove. In the Vehicle Assembly Building, external tank/solid rocket booster post-mate close-outs continue.
STS-87 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-89 -- 8th MIR DOCKING & SPACEHAB DM
NOTE: The tunnel adapter's forward extension was installed yesterday and leak checks are in work. Leak and functional checks of the Shuttle's three auxiliary power units continue. Endeavour's body flap inspections continue. In the Hypergolic Maintenance Facility, work continues on the right-hand orbital maneuvering system (OMS) pod in preparation for its delivery to the OPF on Friday night.
STS-89 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-91 -- 9th MIR DOCKING & SPACEHAB-SMNOTE: Discovery will move to high bay 2 in the VAB this afternoon, to make room in OPF bay 3 for Atlantis' return. The orbiter will remain in temporary storage until Oct. 27 and no processing work is scheduled for the vehicle during that time.
For automatic e-mail subscriptions to this daily Shuttle status report or KSC originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/