![]() FRIDAY, APRIL 3, 1998 (3:41 PM EST) E-mail: Joel.Wells-1@ksc.nasa.gov STS-90 -- NEUROLAB
NOTE: At Pad 39B, prelaunch propellant load is complete. Columbia is currently powered down to allow workers to replace an electrical circuit breaker that supports main engine No. 2. The breaker failed during tests yesterday. Ordnance canister modifications in Columbia's aft compartment have resumed following successful hypergol loading efforts. Early next week, orbiter aft compartment close-outs and ordnance installation activities begin. The STS-90 Flight Readiness Review concluded yesterday afternoon and NASA managers affirmed April 16 as Columbia's official launch date. STS-90 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-91 -- 9TH AND FINAL MIR DOCKING, SPACEHAB-SM
NOTE: Installation of Discovery's main engines began last night with engine No. 1. Main engines No. 2 and No. 3 will be installed today. Body flap rub panel work will resume next week. In the orbiter's midbody, functional testing of the orbiter docking system's upper hatch is complete and payload premate testing continues. The assembly power controller units that support the AMS payload arrived in the OPF this week and are being installed today. Preparations continue for tunnel adapter installation early next week. STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATION(NODE-1, PMAs 1 and 2)
NOTE: Removal of residual propellants from Endeavour's right-hand orbiter maneuvering system cross-feed lines is complete and removal of the right-hand OMS pod is slated for next week. Torque checks of the right wing-to-fuselage attach bolts continue. Main propulsion system gaseous helium leak checks are slated for next week. STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release." Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/ |