![]() WEDNESDAY, APRIL 8, 1998 (11:10 AM EDT) E-mail: Joel.Wells-1@ksc.nasa.gov STS-90 -- NEUROLAB
NOTE: Columbia's prelaunch preparations continue on schedule with the launch countdown slated to begin early Monday morning. Orbiter aft compartment closeouts are proceeding very well and will conclude Saturday. Payload early stow activities are nearing completion today in the orbiter's cargo bay. Ordnance installation begins later today following final inspections of the right forward booster integrated electronic assembly. STS-90 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-91 -- 9TH AND FINAL MIR DOCKING, SPACEHAB-SM
NOTE: Interface verification testing of the assembly power controller units that support the AMS payload is complete. Discovery's main engine and main propulsion system integrated testing continues and inspection of the ground support equipment used during leak checks is in work. Payload premate testing concludes this week. Preparations for tunnel adapter installation are in work and the SPACEHAB tunnel will be installed Saturday. Body flap closeouts continue. Preparations for Friday's Crew Equipment Interface Test are under way. STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATION(NODE-1, PMAs 1 and 2)
NOTE: Preparations for the removal of Endeavour's right-hand OMS pod are complete and pod removal efforts begin later today. Main propulsion system leak checks continue with helium system tests in work. Liquid oxygen system testing will follow next week. Torque checks of the right wing-to-fuselage attach bolts continue. STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription. To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release." Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/ |