KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      MONDAY, AUGUST 3, 1998 (12:47 PM EDT)

      KSC Public Affairs Contact: Joel Wells (fax: 407-867-2692)

      Launch Viewing Information

      MISSION: STS-95 -- SPACEHAB-SM, SPARTAN & HOST

      STS-95 images

      • VEHICLE: Discovery/OV-103
      • LOCATION: Orbiter Processing Facility bay 2
      • TARGET KSC LAUNCH DATE/TIME: Oct. 29 at 2 p.m. EDT
      • TARGET KSC LANDING DATE/TIME: Nov. 7 at 12:04 p.m. EDT
      • MISSION DURATION: 8 days, 22 hours and 4 minutes
      • CREW: Brown, Lindsey, Parazynski, Robinson, Duque, Makai, Glenn
      • ORBITAL ALTITUDE and INCLINATION: 310 nautical miles/28.45 degrees

      NOTE: Last Friday, workers completed Discovery's fuel cell voltage tests, and the orbiter's forward reaction control system (FRCS) was installed. FRCS interface verification testing is under way. The recently replaced fuel cell water relief valve is being brazed to the panel today. Installation of the integrated vehicle health monitoring system continues, and main landing gear wheel and tire installation is in work. Auxiliary power unit and main propulsion system leak and functional tests are scheduled for this week.

      STS-95 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Main propulsion system leak and functional test (Aug. 5)
      • Auxiliary power unit leak and functional test (Aug. 6)
      • Shuttle main engine installation complete (Aug. 14)

      MISSION: STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATION
      UNITY connecting module

      STS-88 images

      • VEHICLE: Endeavour/OV-105
      • LOCATION: OPF bay 1
      • TARGET KSC LAUNCH DATE/TIME: Dec. 3 at 4:45 a.m. EST
      • TARGET KSC LANDING DATE/TIME: Dec. 14 at 12:45 a.m. EST
      • MISSION DURATION: 10 days, 20 hours
      • CREW: Cabana, Sturckow, Currie, Ross, Newman, Krikalev
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: Endeavour's payload premate test continues with video and communication checks in work today. Main engine heat shield attach point rework continues. Functional tests of the orbiter's waste collection system continue. Tunnel adapter installation is planned for early next week.

      STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Power converter units No. 1 and No. 2 installation (Aug. 10)

      MISSION: STS-93 -- Advanced X-ray Astrophysics Facility (AXAF)

      STS-93 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: OPF bay 3
      • TARGET KSC LAUNCH DATE/TIME: Jan. 21, 1999 at 11:37 a.m. EST
      • TARGET KSC LANDING DATE/TIME: Jan. 26, 1999 at 10:40 a.m. EST
      • LAUNCH WINDOW: 43 minutes
      • MISSION DURATION: 4 days, 23 hours, 3 minutes
      • CREW: Collins, Ashby, Hawley, Coleman, Tognini
      • ORBITAL ALTITUDE and INCLINATION: 153 nautical miles/28.45 degrees

      NOTE: Connection of the hydraulic pumps for auxiliary power units No. 1 and No. 3 is complete. Technicians are replacing Columbia's power control assembly No. 1 and digital command assembly No. 1 this week. Window No. 1 has been installed and orbiter window polishing begins today.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/