KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
      MONDAY, AUGUST 24, 1998 (12:43 PM EDT)

      KSC Public Affairs Contact: Joel Wells (fax: 407-867-2692)

      Launch Viewing Information

      MISSION: STS-95 -- SPACEHAB-SM, SPARTAN & HOST

      STS-95 images

      • VEHICLE: Discovery/OV-103
      • LOCATION: Orbiter Processing Facility bay 2
      • TARGET KSC LAUNCH DATE/TIME: Oct. 29 at 2 p.m. EST
      • TARGET KSC LANDING DATE/TIME: Nov. 7 at 12:04 p.m. EST
      • MISSION DURATION: 8 days, 22 hours and 4 minutes
      • CREW: Brown, Lindsey, Parazynski, Robinson, Duque, Makai, Glenn
      • ORBITAL ALTITUDE and INCLINATION: 310 nautical miles/28.45 degrees

      NOTE: Last week, Discovery's main engines were installed. On Saturday, KSC technicians began precautionary efforts to secure Discovery, Endeavour and Columbia in their respective OPF bays due to the threat of Hurricane Bonnie. Discovery's payload bay doors were closed and the orbiter was powered down. Managers will continue to monitor the hurricane's status and hope to resume processing later today. Once the decision to proceed is made, workers will power up the orbiter and launch processing system, open the payload doors and deploy the Ku band antenna. Also, main engine securing and pump torque checks are scheduled. Payload premate testing will follow payload bay door opening. Work delays due to hurricane preparedness efforts are not expected to impact any major Shuttle processing milestones.

      STS-95 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Payload premate test (Aug. 24)
      • External tank and SRB mate (Aug. 25)
      • Crew Equipment Interface Test (Sept. 2)

      MISSION: STS-88 -- FIRST FLIGHT INTERNATIONAL SPACE STATION
      UNITY connecting module

      STS-88 images

      • VEHICLE: Endeavour/OV-105
      • LOCATION: OPF bay 1
      • TARGET KSC LAUNCH DATE/TIME: Dec. 3 at 4:45 a.m. EST
      • TARGET KSC LANDING DATE/TIME: Dec. 14 at 11:14 p.m. EST
      • MISSION DURATION: 11 days, 18 hours and 29 minutes
      • CREW: Cabana, Sturckow, Currie, Ross, Newman, Krikalev
      • ORBITAL ALTITUDE and INCLINATION: 173 nautical miles/51.6 degrees

      NOTE: Endeavour's power converter unit installation is complete. Functional checks on the orbiter docking system (ODS) were conducted last week and ODS electrical testing begins tomorrow. On Saturday, due to the threat of Hurricane Bonnie, Endeavour's payload bay doors were closed and the orbiter was powered down. Once processing resumes, workers will power up the orbiter and launch processing system and open the payload doors. Main engine heat shield attach point rework and tunnel adapter installation efforts will also resume.

      STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

      • Transfer tunnel adapter installation (Aug. 25)
      • Power converter unit interface verification test complete (Aug. 26)
      • Shuttle main engine installation complete (Sept. 4)

      MISSION: STS-93 -- Advanced X-ray Astrophysics Facility (AXAF)

      STS-93 images

      • VEHICLE: Columbia/OV-102
      • LOCATION: OPF bay 3
      • TARGET KSC LAUNCH DATE/TIME: Jan. 21, 1999 at 11:26 a.m. EST
      • TARGET KSC LANDING DATE/TIME: Jan. 26, 1999 at 10:33 a.m. EST
      • LAUNCH WINDOW: 43 minutes
      • MISSION DURATION: 4 days, 23 hours, 7 minutes
      • CREW: Collins, Ashby, Hawley, Coleman, Tognini
      • ORBITAL ALTITUDE and INCLINATION: 153 nautical miles/28.45 degrees

      NOTE: On Saturday, as a precaution due to the threat of Hurricane Bonnie, Columbia's payload bay doors were closed and the orbiter was powered down. Managers will continue to monitor the hurricane's status and hope to resume processing later today.

      --end--

      For automatic e-mail subscriptions to these Shuttle status reports or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.

      To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."

      Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm

      Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/