STS-90 -- NEUROLAB
NOTE: Installation of Columbia's airlock hatch "D" is complete. The hatch provides access from the tunnel adapter to the Spacelab transfer tunnel. Today, work is under way to install new bushings on the main engine heat shields. Inspections of micrometeorite hits on an orbiter radiator and aft compartment closeouts are also in work. Columbia's main engines are slated for installation next Thursday and tunnel adapter pressure decay checks begin tomorrow afternoon.
The payload premate test is ongoing and Neurolab's installation into the orbiter's payload bay is planned for Feb. 11.
STS-90 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-91 -- 9TH MIR DOCKING & SPACEHAB-SMNOTE: Installation of Discovery's three auxiliary power units is under way and will continue through Monday. Work on the power drive unit for the right external tank umbilical door continues. Body flap corrosion repair and super lightweight tank instrumentation modifications are also in work. The new super lightweight external tank, to be used on STS-91, remains docked on its barge at Port Canaveral. High winds have prevented tugboat operations so far this week and today managers predict the tank will arrive at KSC's turn basin no earlier than 10 a.m. tomorrow, weather permitting.
STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 (01-2A) ISS FIRST FLIGHTNOTE:Flight crew equipment destow is complete and Endeavour's postflight inspections continue on schedule. Strong back installation and payload bay door opening were completed yesterday and SPACEHAB removal is slated for Monday. Technicians continue to install access platforms in the orbiter's aft compartment and main propulsion system inspections begin next week.
STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/