STS-90 -- NEUROLAB
NOTE: Functional tests on Columbia’s airlock hatch "D" are complete. Inspections of micrometeorite hits on an orbiter radiator and checks on the orbiter’s environmental control and life support system are complete. Aft compartment closeouts and payload premate testing continue. Technicians proceeded with main engine heat shield rework efforts today and no work is planned on Columbia over the weekend.
Next week, the Neurolab payload is scheduled to arrive at the OPF on Wednesday for installation into the orbiter’s cargo bay and Shuttle main engines will be installed on Thursday.
STS-90 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-91 -- 9TH MIR DOCKING & SPACEHAB-SM
NOTE: Tests on Discovery’s power reactant storage and distribution system are complete. Installation of the orbiter’s three auxiliary power units continues through Monday. Work on the power drive unit for the right external tank umbilical door continues. Body flap corrosion repair and super lightweight tank instrumentation modifications are also in work.
The new super lightweight external tank, to be used on STS-91, arrived at KSC’s turn basin at about 11 a.m. today. Workers transported the 154-foot-long improved tank to the Vehicle Assembly Building this afternoon, where it will undergo processing for flight. The new tank weighs about 7,500 pounds less than the original ET.
STS-91 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
STS-88 (01-2A) ISS FIRST FLIGHT
NOTE: Payload disconnects are complete and removal is slated for Monday. Shuttle main engine post-flight inspections are under way and Ku antenna assembly checks are in work as well. Removal of Endeavour’s tunnel adapter is scheduled for later next week.
STS-88 SCHEDULED OPERATIONAL MILESTONES (dates are target only):
For automatic e-mail subscriptions to this daily Shuttle status report or KSC-originated press releases, send an Internet electronic mail message to domo@news.ksc.nasa.gov. In the body of the message (not the subject line) type the words "subscribe shuttle-status", or "subscribe ksc-press-release" (do not use quotation marks). The system will reply with a confirmation via e-mail of each subscription.
To remove your name from the list at any time, send an e-mail address to domo@news.ksc.nasa.gov. In the body of the message (not the subject line), type (no quotes) "unsubscribe shuttle-status", or "unsubscribe ksc-press-release."
Status reports and other NASA publications are available on the World Wide Web at: http://www-pao.ksc.nasa.gov/kscpao/kscpao.htm
Information about the countdown and mission can be accessed electronically via the Internet at: http://www.ksc.nasa.gov/shuttle/countdown/ and at http://shuttle.nasa.gov/